Browse
Search
Agenda - 09-16-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 09-16-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 11:46:27 AM
Creation date
9/26/2016 1:46:17 PM
Metadata
Fields
Template:
BOCC
Date
9/16/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hazen and Sawyer has, worked extensively in All aspects of <br /> SECTION IX rater supply planning and design throughout the United States and <br /> .broad. Relevant and recent experience in North Carolina is as <br /> QUALIFICATIONS AND WORK PLAN ollowss ' <br /> 2eRngo W # attd ewae t tvk, CarrbarM X:C. <br /> Hazen and Sawyer has performed all of the professional Cane Creek Dam and Reservoir <br /> engineering services encompassed in the Request for Proposals for <br /> various clients in North Carolina and throughout the United The Cane Creek Reservoir demonstrates Hazen and Sawyer's <br /> States. Since its beginning in 1951, Hazen and Sawyer has continuing involvement in the development of water resources <br /> concentrated its efforts in the field of. environmental In Orange County, North Carolina . Development of the <br /> engineering, those services related to the development of water reservoir was first recommended in a report. prepared for the <br /> supply and wastewater disposal projects. All of the proposed University of North Carolina by Hazen and Sawyer in IM9. <br /> personnel for this project have substantial "hands on" experience Since 1977, Hazen and Sawyer has worked closely with the <br /> directly related to their assigned tasks. orange water and Sewer Authority-to develop Cane Creek as an <br /> additional source of raw water to serve southern Orange <br /> We have presented below our evaluation of effort necessary > County. Cane Creek••was• selected as'the most appropriate <br /> for the preparation of each report, a brief list of similar source of additional wat'e•r supply after very careful <br /> projects undertaken by Hazen and Sawyer, with concentration on consideration of a number of alternative reservoir sites and <br /> projects in North Carolina, and our means of accomplishing each projects. Development of Cane Creek was recommended based <br /> item listed in the Request for Proposals. its capability to provide a -dependable high-quality source <br /> of raw water at •a reasonable cost to the citizens of orange <br /> County. <br /> II.A. UPPER ENO RESERVOIR DEVELOPMENT The project Includes an earth dam FEASIBILITY REPORT P j approximately 75-feet <br /> high, containing roughly 200,000 cubic yards of compacted <br /> fill, a gated concrete service spillway, a multi-level raw <br /> water intake, 10 mgd raw water pumping station and 6 mites ' <br /> Hazen. and Sawyer will undertake a feasibility study of water of 24 -inch diameter raw water transmission main. <br /> sv 1 develo ment In the U Preliminary engineering design and geotechnical <br /> P� Y p Upper Eno River Basin n as generally investigations. are complete.. <br /> out fined in the Request for Proposals. _ <br /> The project engineer designated for the Reservoir Department of water Resources, City of Durham, N.C. <br /> Feasibility Study would be Mr. Donald L. Cordell. Mr. Cordell Little River Dam and Reservoir <br /> has extensive experience in water supply planning and evaluation <br /> having been actively involved in the ongoing planning for The Little River Dam and Reservoir will provide the City of <br /> development of the Cane Creek Dam and Reservoir for orange Water Durham with an additional source of, raw wester to supplement <br /> and Sewer Authority and the Little River Dam and Reservoir for <br /> the City of Durham. Mr. Cordell has played a major role in the water from Lake Michle located oq the Fl-a-t.-Diver. Hazen and <br /> planning and detailed engineering studies and investigations Sawyer completed.the initial feasibility report recommending <br /> undertaken on each of these projects since joining Hazen and construction of the Littae River Dam in 1974 and has <br /> Sawyer in 1976. His experience in water resource development in prepared several subsequent detailed engineering and <br /> Piedmont North Carolina will insure that the feasibility report, environmental impact reports for use by the City of Durham <br /> a critical first step in the planning process for development of in support of the required permit applications. <br /> an additional water supply, establishes the background and In recommending construction of the Little River dam, Hazen <br /> technical Information necessary for the successful development of w}'and Sawyer evaluated numerous other dam sites on the Little <br /> a new source of supply. , <br /> Flat, and Eno Rivers. Raw water intakes in Falls Lake and <br /> Jordan Lake were also considered as possible solutions to <br /> 0 <br /> N <br /> It-1 __ _. _.. . 1I-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.