Browse
Search
Agenda - 09-02-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 09-02-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 10:10:26 AM
Creation date
9/26/2016 12:22:23 PM
Metadata
Fields
Template:
BOCC
Date
9/2/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c 7. <br /> MANGE Distribution to: Dail Dixon and Associates <br /> 1 <br /> t ORDER OWNER ❑ Suite 220A Carr Mill <br /> MA DOCUMENT G701 ARCHITECT ❑ Carrboro, N.C. 27510 <br /> CONTRACTOR ❑ 919-968-8333 <br /> • <br /> FIELD ❑ <br /> OTHER ❑ <br /> PROJECT: Orange County Animal Shelter CHANGE ORDER NUMBER: 2 <br /> (name, address) Expansion, Chapel Hill, N.C. <br /> TO (Contractor): <br /> INITIATION DATE: 8-28-86 <br /> `� ARCHITECT'S PROJECT NO: 85-101 <br /> Acme Plumbing and Heating Co. 1n <br /> P.O. Box 2288 cCONTRACT FOR: Orange County Animal <br /> Durham, N.C. 27702 Shelter Expansion <br /> L J CONTRACT DATE: 2-18-86 <br /> You are directed to make the following changes in this Contract: <br /> Contract substantial completion date shall be extended from September 12, 1986 <br /> to October 17, 1986 per. Holt Construction Co. Proposal for extension. <br /> • <br /> Not valid until signed by both the Owner and Architect. <br /> Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. <br /> The original (Contract Sum) (EaCaKNffeXXAXKYRKJOU14 was $ 9,950.00 <br /> Net change by previously authorized Change Orders $ 90.00 <br /> The (Contract Sum) ( r nl'ekiNtsreaNiklaatNprior to this Change Order was $ 10,040.00 • <br /> The (Contract Sum) (OXriikWcKAil iXi t will be (t' i s ai XX (unchanged) <br /> by this Change Order $ .00 <br /> The new (Contract Sum) ( 1XrN X441rAXIICINcxNncluding this Change Order will be $ 10,040.00 <br /> The Contract Time will be (increased) �0 NRIX I� by <br /> The Date of Substantial Completion as of the date of this Change Order therefore is October 17, 1986 ( 35 ) Days <br /> Dail Dixon and Associates Authorized: <br /> ARCHITE Acme Plumbing & Heating Co. Orange County <br /> uite1LOA Carr Mill RA oR E - <br /> �- �ox 2288 TN ERE Margaret Lane <br /> Address Address <br /> • Carrboro, N.C. 27510 D z� Adill- <br /> _7702 Hill�•orou•h N.C. <br /> BY 1 B; .`IIrJ , //� <br /> DATE Z8 4140 8C� DATE 1 . DATE w <br /> AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • AIA® • © 1978 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., N.W.,WASHINGTON, D.C. 20006 G701—1978 <br />
The URL can be used to link to this page
Your browser does not support the video tag.