Browse
Search
Agenda - 09-02-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 09-02-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 10:10:26 AM
Creation date
9/26/2016 12:22:23 PM
Metadata
Fields
Template:
BOCC
Date
9/2/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE Distribution to: . Lail Dixon and Associates <br /> ORDER <br /> 18 OWNER ❑ Suite -220A, Carr Mill <br /> 18 ei ARCHITECT ❑ Carrboro, N.C. 27510 <br /> A/A DOCUMENT G701 CONTRACTOR ❑ 910-968--8333 <br /> FIELD ❑ <br /> OTHER [I • <br /> PROJECT: Orange County Animal Shelter CHANGE ORDER NUMBER: 1 <br /> (name, address) Expansion, Chapel Hill, N.C. <br /> INITIATION DATE: 8 - 26 - 86 <br /> TO (Contractor): <br /> ARCHITECT'S PROJECT NO: 85-101 <br /> Acme Plumbing & Heating Co. Inc. CONTRACT FOR:Orange County Animal <br /> P.O. Box 2288 y <br /> Durham, N.C. 27702 <br /> Shelter Expansion <br /> CONTRACT DATE: 2 --- 18 - 86 • <br /> You are directed to make the following changes in this Contract: <br /> Remove the existing sink from the existing kitchen countertop and reinstall <br /> the same sink into the new countertop (by the General Contractor, See Holt <br /> Construction Co. Change Order No. 2) as per Acme Plumbing and Heating Co. <br /> Incas letter dated 8-26-86. <br /> • <br /> Not valid until signed by both the Owner and Architect_ <br /> Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. <br /> The original (Contract Sum) (4tcNNO I IXDI X5l was $ 9,950.00 <br /> Net change by previously authorized Change Orders $ .00 <br /> The (Contract Sum) ( iKANMARrIsCI-X�3XCX)X) prior to this Change Order was $ 9,950.00 <br /> The (Contract Sum) (cXaXiXtx )' rxif i iX) will be (increased) (cl s r?b t XGt ii)fri) <br /> by this Change Order $ 90.00 _ <br /> The new (Contract Sum) ( xtxt i x>kiNiEt including this Change Order will be $ 10,040.00 <br /> The Contract Time will be (KINNXItXdON?IN• 4 (unchanged) by ( 0 ) Days. <br /> The Date of Substantial Completion as of the date of this Change Order therefore is September 12, 1986. <br /> Authorized: <br /> fail_Dixon and Associates Acme Plumbing & Heating Co. Orange County <br /> ARCHITECT CONTRACTOR <br /> Suite___22�g, Carr Mill P.O. Box 2288 Inc- 1%11Y. Margaret Lane <br /> Address Address <br /> Address <br /> Carrboro, N. 0 27510 Durham, N. C. 27702 Hillsborourt. N. C. 27278 <br /> MMEMMEMMEMEMEr <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.