Browse
Search
Agenda - 09-02-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 09-02-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 10:10:26 AM
Creation date
9/26/2016 12:22:23 PM
Metadata
Fields
Template:
BOCC
Date
9/2/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• TT <br /> 17 <br /> CHANGE Distribution to: DAIL DIXON & ASSOCIATES <br /> ORDER OWNER ❑ SUITE 220A CARR MILL • <br /> ARCHITECT ❑ CARRBORO, NC 27510 <br /> AMA DOCUMENT G701 CONTRACTOR ❑ (919) 968-8333 <br /> FIELD ❑ <br /> OTHER ❑ <br /> PROJECT: Orange County Animal Shelter CHANGE ORDER NUMBER: 2 <br /> (name, address) Expansion <br /> INITIATION DATE: 5/25/86 <br /> TO (Contractor): <br /> ARCHITECT'S PROJECT NO: 85/101 <br /> Holt Construction Co. CONTRACT FOR: Orange County Animal <br /> PO Drawer 118 Shelter Expansion <br /> Graham, NC 27253 <br /> CONTRACT DATE: 3/17/86 <br /> You are directed to make the following changes in this Contract: <br /> Replace existing- Formica cabinet top in existing kitchen to match new <br /> counter top per your letter dated August 22, 1986, including 10% <br /> overhead and profit. <br /> Nut \.,lid until signed by both the Owner and Architect, <br /> Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time, <br /> The original (Contract Sum) (Crxttortgstmarc was $ 56,460.00 <br /> Net change by previously authorized Change Orders $ 271.70 <br /> The (Contract Sum) (iaixixocatifdflx1Xmxxx3Sacsi4 prior to this Change Order was $ 56,731.70 • <br /> The (Contract Sum) (Z�aMtdxgrxXXpr) will be (increased) i � a <br /> by this Change Order $ 167.00 <br /> • <br /> The new (Contract Sum) (k4sstrxki including this Change Order will be $ 56,898.70 <br /> The Contract Time will be (Mztem Nr i c(unchanged) by ( 0 ) Days. <br /> The Date of Substantial Completion as of the date of this Change Order therefore is September 12, 1986. <br /> Authorized: <br /> Dail Dixon & Associates Holt Construction Co. Orange County <br /> CO P1 A TOR A: uit :T 220A Carr Mill rawer 118 oW N1W <br /> 6 E. Margaret Lane <br /> Address Address <br /> Address • <br /> C`arrlioro, NC 27510 Graham, NC or.oug 27253 Hillsb NC <br /> —` 1 i �_ � 27273 <br /> DAIL <br /> I • <br /> f- . _.... .. .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.