Browse
Search
Agenda - 09-02-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 09-02-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 10:10:26 AM
Creation date
9/26/2016 12:22:23 PM
Metadata
Fields
Template:
BOCC
Date
9/2/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE Distribution to: Dail Dixon and Associates 17t <br /> ORDER OWNER ❑ Suite 220A Carr Mill <br /> AIA DOCUMENT G701 ARCHITECT ❑ Carrboro, N. C. 27510 <br /> CONTRACTOR Cl 919-968-8333 <br /> FIELD ❑ <br /> OTHER ❑ <br /> PROJECT: Orange County Animal Shelter CHANGE ORDER NUMBER: 3 <br /> (name, address) Expansion , Chapel Hill, N.C. <br /> INITIATION DATE: 8-28-86 <br /> TO (Contractor): <br /> 1 ARCHITECT'S PROJECT NO: 85-101 <br /> Holt Construction Co. Inc. <br /> P.O. Drawer 118 CONTRACT FOR: Orange County Animal <br /> Graham, N.C. 27253 Shelter Expansion <br /> J CONTRACT DATE: 3-17-86 <br /> You are directed to make the following changes in this Contract: <br /> Contract substantial completion date shall be extended from September 12, <br /> 1986 to October 17, 1986 per letter from Holt Construction Co. Inc. dated <br /> August 22, 1986 indicating delays due to the split block delivery time <br /> which was beyond the control of the contractor. <br /> Not valid until signed by both the Owner and Architect. <br /> Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. <br /> The original (Contract Sum) (N1XiXtX€NIM airXXN ,vas $ 56,460.00 <br /> Net change by previously authorized Change Orders $ 438.70 <br /> The (Contract Sum) (1 IXINK*Xlit�1,0LX prior to this Change Order was $ 56,898.70 <br /> The (Contract Sum) 1 IXIIiffe l >Nr i X) will be Kri€rMMl(( ria (unchanged) <br /> by this Change Order $ .00 <br /> The new (Contract Sum) (Xximxtp;;e X1/00 )CksX including this Change Order will he $ 56,898.70 <br /> The Contract Time will he (increased) (ItXrXNEXWICtICO.frX=X41 by ( 35 ) Days. <br /> The Date of Substantial Completion as of the date of this Change Order therefore is October 17, 1986 <br /> Authorized: <br /> Dail D .elates Holt Construction Co. Inc. Orange County <br /> ARCHITECT ?N.TRA 'l OI: WNF' <br /> Suite 220A Carr Mill — �.�. Drawer 118 ?( �. Margaret Lane <br /> Addre c Address Address <br /> N. C. 27510 Graham, N. C. 2725.E <br /> ....... ......--- ... --- ---- - • hlil.lboroug')? N- cw...--- --t S �-- - <br /> .n <br /> . , <br />
The URL can be used to link to this page
Your browser does not support the video tag.