Orange County NC Website
C _ y • <br /> • <br /> APPLICATION FOR EROSION CONTROL PLAN APPROVAL AND GRADING PERMIT <br /> • ORANGE COUNTY EROSION CONTROL ORDINANCE <br /> SEDIMENTATION AND - EROSION CONTROL DIVISION <br /> • <br /> ORANGE .000NTY PLANNING DEPARTMENT <br /> • 106 EAST MARGARET LANE <br /> HILLSBOROUGH, N.G. 27278 <br /> 1, NAME OF PROJECT: Carolina Paving - Turner • - <br /> 2. LOCATION OF PROJECT: Route 2 Box,556 Durham, N. C. 27702 <br /> TOWNSHIP: EnO 1AK MAP �5 BLOCK: • - LOT:_ 77 <br /> JURISDICTIONAL AREA: OrAngP. npixni-,y - <br /> 3. SIZE OF TRACT: _15.6± . AC.; AMOUNT OF DISTURBANCE: 54J4,500 <br /> . 4. _ TYPE -OF CONSTRUCTION: clearing & grading - ` <br /> 5. PLANS PREPARED By: Credle Engineering Co. Inc. <br /> ADDRESS: Durham, N.C. • <br /> _PHONE:-682-20°6 <br /> . CONTACT: Sidney Credle - <br /> 6. PERSON OR FIRM RESPONSIBLE FOR IMPLEMENTING THE EROSION CONTROL PLAN: <br /> NAME: Allen E. Turner _ <br /> Durham, N.C. . <br /> ADDRESS: • - PHONE': <br /> •• CONTACT • <br /> • <br /> • OFFICE USE ONLY <br /> 7.. FEES: = <br /> PLAN REVIEW: $ ,937•50 DATE PAID RECEIPT if <br /> GRADING PERMIT: $ 1.875.00 DATE PAID - RECEIPT f _ <br /> TOTAL: $ 2$12.50 DATE PAID 7-44 .1.6 RECEIPT i 393 <br /> • <br /> S. APPLICATION AND PERMIT REQUIREMENTS PLEASE READ CAREFULLY ! ! ! - _ <br /> THIS APPLICATION IS SUBMITTED AND ACCEPTED SUBJECT TO THE ,FOLLOWING <br /> • CONDITIONS: <br /> - THE INFORMATION PROVIDED ON THIS FORM IS, TO THE BEST OF MY KNOWLEDGE, <br /> ACCURATE AND COMPLETE. <br /> PERSONNEL- FROM- THE EROSION-CONTROL DIVI ION SHALL VISIT -THE SITE I I <br /> ORDER . TO--DETERMINE IF - THE ROS I ON CONTROL- LAN IS ACCEPTABLE. AND TO <br /> INSPECT THE..SITE .FOR COMPLIANCE ONCE A GRADING PERMIT IS ISSUED. <br /> . ALL EROSION. CONTROL DEVICES SHOWN ON THE APPROVED -PLAN- OR..DESCRIBED <br /> EIN THE PLAN NARRATIVE AND ANY MODIFICATIONS TO THE- PLAN REQUIRED BY THE <br /> ROSION CONTROL OFFICER . SHALL BE. .INSTALLED AT THE APPROPRIATE TIME IN <br /> . THE CONSTRUCTION- SEQUENCE .AND MAINTAINED ACCORDING TO THE APPROVED PLAN. <br /> - UPON -COMPLETION-OF CONSTRUCTION, THE. SITE SHALL BE STABILIZED IN A. <br /> PERMANENT MANNER AS DESCRIBED IN THE' EROSION CONTROL PLAN. <br /> • <br /> . " CONTINUED ON BACK <br /> • <br />