Orange County NC Website
►► <br /> PAGE 4 <br /> 1 5, <br /> r. <br /> WATER PROJECTS <br /> 1. WATER STUDY PROJECT <br /> Appropriation Amount: $11,600 <br /> These funds provide for the engineering services related <br /> to the more immediate water problems, such as <br /> transferring water between jurisdictions. <br /> 2. COUNTY RESERVOIR PROJECT <br /> Appropriation Amount: $60,000 <br /> This project is the conclusion of a study and verifi- <br /> cation of certain non-correlative data that came as a <br /> result of that study. The intended result is the <br /> determination of the reservoir site, testing required by <br /> the State and to obtain engineering data from which to <br /> prepare preliminary construction design and cost <br /> estimates. <br /> Project is targeted to begin within sixty (60) days. <br /> 3. LAR ORANGE IMPROVEMENTS <br /> Appropriation Amount: $90,000 <br /> The intent of this project is to raise the water level <br /> of Lake Orange by using flashboards and making piers, <br /> boathouses and roads accessible at new water level. <br /> Project is targeted to begin within thirty (30) days. <br />