Browse
Search
Agenda - 08-19-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 08-19-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 12:13:13 PM
Creation date
9/26/2016 11:29:35 AM
Metadata
Fields
Template:
BOCC
Date
8/19/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
140 <br /> OWNER INITIATED ADDITIONS <br /> TO THE SCOPE OF WORK <br /> CARR BUILDING RENOVATION <br /> 1 . Incorporating the plumbing store space into the plan after <br /> the initial space plan was completed generated changes to the <br /> entire floorplan including modifications to the plumbing <br /> facilities. <br /> 2. Originally the cabinets existing in Agricultural Extension <br /> were to be used to subdivide that department in the new space. <br /> The cabinets were inventoried and incorporated into the plan. <br /> It was then decided not to reuse the cabinets and a new plan had <br /> to be drawn showing full height walls. Similarly, the existing <br /> kitchen cabinets were to be reused and when that plan was <br /> changed details for the new kitchen had to be drawn. <br /> 3. Partition walls were added to the Planning Department and <br /> the Environmental Health Department when originally they were to <br /> be open offices. <br /> 4. The Forestry Department was added to the program. <br /> 5. An additional sink and water fountain were added in a remote <br /> location requiring changes to the plumbing plan. <br /> 6. Alternate using gas HVAC was added. <br /> 7. The above listed changes precipitated continual revisionsto <br /> tie cost estimate. Because of the tight budget on this project <br /> extra time was spent working closely with local contractors to <br /> facilitate bringing the bids in within the budget. <br />
The URL can be used to link to this page
Your browser does not support the video tag.