Orange County NC Website
140 <br /> OWNER INITIATED ADDITIONS <br /> TO THE SCOPE OF WORK <br /> CARR BUILDING RENOVATION <br /> 1 . Incorporating the plumbing store space into the plan after <br /> the initial space plan was completed generated changes to the <br /> entire floorplan including modifications to the plumbing <br /> facilities. <br /> 2. Originally the cabinets existing in Agricultural Extension <br /> were to be used to subdivide that department in the new space. <br /> The cabinets were inventoried and incorporated into the plan. <br /> It was then decided not to reuse the cabinets and a new plan had <br /> to be drawn showing full height walls. Similarly, the existing <br /> kitchen cabinets were to be reused and when that plan was <br /> changed details for the new kitchen had to be drawn. <br /> 3. Partition walls were added to the Planning Department and <br /> the Environmental Health Department when originally they were to <br /> be open offices. <br /> 4. The Forestry Department was added to the program. <br /> 5. An additional sink and water fountain were added in a remote <br /> location requiring changes to the plumbing plan. <br /> 6. Alternate using gas HVAC was added. <br /> 7. The above listed changes precipitated continual revisionsto <br /> tie cost estimate. Because of the tight budget on this project <br /> extra time was spent working closely with local contractors to <br /> facilitate bringing the bids in within the budget. <br />