Browse
Search
2016-537-E Solid Waste - Kessler Consulting, Inc. for waste characterization study
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-537-E Solid Waste - Kessler Consulting, Inc. for waste characterization study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2016 9:57:33 AM
Creation date
9/26/2016 8:43:20 AM
Metadata
Fields
Template:
BOCC
Date
9/23/2016
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Amount
$59,900.00
Document Relationships
R 2016-537-E SW - Kessler Consulting, Inc. for waste characterization study
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:BO8E3DDA-6A84-496A-9141-79CF798AEA7B <br /> Blair 1='ollock,Orange County, NC 1 09/19/2016 I Page 3 of.' <br /> ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ <br /> Task 3—Analyze Data and Prepare Final Report <br /> • Analyze the data from the first sorting event to calculate the percentage by weight of each <br /> material category for each generator sector and for each jurisdiction. KCI will also calculate 90 <br /> percent confidence intervals. Data analysis will follow industry-accepted standards for statistical <br /> analysis as outlined in the ASTM Standard Test Method for Determination of the Composition of <br /> Unprocessed Municipal Solid Waste (D5231-92; reapproved 2008). <br /> • Prepare an interim technical memorandum summarizing the results of the first sorting event. <br /> • Analyze the data from the second sorting event to calculate the percentage by weight of each <br /> material category for each generator sector and for each jurisdiction. KCI will also calculate 90 <br /> percent confidence intervals. <br /> • Calculate annual results by combining the results of the two sorting events. <br /> • Prepare a draft report summarizing the results of both sorting events. <br /> • Review the draft report with County staff. <br /> • Revise and finalize the report based on comments from County staff. <br /> Deliverables <br /> • Material category list, sampling schedule, sampling and sorting protocol, and site safety plan <br /> (transmitted electronically). <br /> • Draft and final study report (transmitted electronically with hard copies available upon request). <br /> • Participation in audio or video conference calls as necessary. <br /> Estimated Budget and Timeline <br /> KCI proposes to conduct this scope of work for a lump sum of$56,900 for a study targeting 45 samples <br /> per sorting event. Should the County opt for a study targeting 50 samples per sorting event, KCI <br /> proposes to conduct this scope of work for a lump sum of$59,900 to allow for additional labor and <br /> supplies. <br /> KCI will submit monthly invoices with a written explanation of activities completed that month. <br /> Payment is due upon receipt of such invoice. <br /> KCI will work with the County to identify an appropriate timeline for the WCS and dates for the sorting <br /> events. We anticipate conducting the first sorting event in October 2016. <br /> We would be happy to discuss this proposed scope of work with you and modify as needed to meet your <br /> objectives and budget. We appreciate the opportunity to submit this proposal and look forward to <br /> working with you on this important project. Please do not hesitate to contact me if you have any <br /> questions. <br /> Sincerely, <br /> Kessler Consulting, Inc. <br /> f��r <br /> Mitch Kessler <br /> President <br /> ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ <br /> Ikessier c nsulting inc. <br /> innovative waste solutions <br /> gy, [OH fl v,1",11 +r,uii�,ry"�nniii7�VVM , , ili�, <br />
The URL can be used to link to this page
Your browser does not support the video tag.