Orange County NC Website
2 <br /> Paul Laughton said all of the aforementioned funds are outside of any potential bond <br /> funds. <br /> 1) Review Chapel Hill Carrboro City Schools (CHCCS) and Orange County Schools <br /> (OCS) Priorities for the Potential Bond Referendum Funds <br /> Bonnie Hammersley said this evening is an opportunity for the schools to report on the <br /> prioritization of their capital projects. <br /> Pam Jones reviewed the updated OCS hand out at the Commissioners' places: <br /> OCS Facility Recommendations <br /> • 2013 Facilities Assessment reflected needed repairs/replacements/additions in excess <br /> of$160M as of the date of the assessment. <br /> • OCS receives approximately $2.6M for capital funding annually. <br /> • Of the $160 million overall needs, OC Board of Education prioritized projects in the <br /> following categories assuming approximately $50 Million would be made available <br /> through bond proceeds or other cost sharing arrangements: <br /> o Safety; <br /> o Critical infrastructure projects whose cost would exceed CIP funding capabilities, <br /> including roof replacement and replacement of antiquated and failing mechanical <br /> systems in some schools; <br /> o Cedar Ridge High School (CRHS) classroom wing addition; <br /> o Replacement of Transportation facilities. <br /> • Phase 1 projects per the attached sheet represent those for which 2016 bond funding <br /> would be utilized. <br /> • To the extent they are available, School Construction Impact Fees are requested for <br /> project planning to ensure "shovel-ready" status. <br /> • Unfunded projects would be addressed as future allocations allowed. <br /> • Based on approved CAP Certificates to date, OCS has adequate elementary and <br /> middle school capacity for the current 10-year CIP period. However, two major <br /> developments in the Town of Hillsborough are likely to significantly diminish the <br /> capacity within a relatively short time period. For that purpose, Elementary #8 has been <br /> included as a Phase III project. The Cedar Ridge classroom addition will address the <br /> needed high school capacity, which is projected to reach SAPFO capacity by 2022. A <br /> planning/constructing/opening period of approximately three years is anticipated. <br /> District leadership remains concerned that the 110% high school capacity upon which <br /> SAPFO is built is no longer a viable and safe level of occupancy and would request the <br /> County's review over the next year. <br /> • Replacement and consolidation of Transportation facilities is included in the OCS <br /> Phase 1 request, but is envisioned as a joint project with CHCCS. OCS is the <br /> recognized LEA for Transportation for both OCS and CHCCS (State only recognizes <br /> one per County). The 1950's vintage Transportation facilities for both CHCCS and OCS <br /> are woefully inadequate. Some buses will not fit and still close the bay doors, for <br /> example. <br /> • Potential bond funds will allow OCS to divert future pay-as-you-go CIP funds to other <br /> critical projects addressed in the Facilities Assessment, but not included in Phase 1 <br /> bond funding. <br />