Orange County NC Website
DocuSign Envelope ID:28DA00F8-4193-4A09-B5AF-6D4761 A9B655 <br /> • Set 32 (thirty-two) 6'x 7" steel bollards on 3' centers in concrete around <br /> the pad. <br /> • In the excavated area, use 4,000 PSI concrete and saw cut the joints <br /> within 24 hours. <br /> • Bollards are to be filled solid with concrete and painted. <br /> • Arrange for a 150 Ton Crane to move the existing 8,000 gallon tank off of <br /> the existing pad and place on a trailer to be moved approximately a 16th <br /> of a mile on the designated property. <br /> • Set the tank on the new excavation area using the same crane. <br /> • Air test the tank at 3 PSI for 1 (one) hour. <br /> • Reinstall the removed tank top equipment back onto the tank as found. <br /> • Owner is to fill the tank to 90% capacity at this time. <br /> • Excavate a trench for a power line approximately 140' over to the existing <br /> building from the tank pad. <br /> • Run new conduit and wire to the designated existing breaker panel <br /> (approximately 160'). <br /> • Backfill the trench with excavated materials removed. <br /> • Install a new pump platform at the tank area. <br /> • Install a new Wayne Fleet single hose single product suction pump on a <br /> pump stand and connect to the AST piping and electrical. <br /> • Startup the system and check for proper operation. <br /> • Clean any debris up created by the Crane Company or Four Star <br /> Petroleum. <br /> Contractor shall not sub-contract all or any part of the construction services <br /> provided for in the Agreement without prior written approval of the Owner. <br /> Contractor shall be responsible for all errors or omissions, in the <br /> performance of the Agreement. Contractor shall correct any and all errors, <br /> omissions, discrepancies, ambiguities, mistakes or conflicts at no additional <br /> cost to Owner. <br /> Contractor has been provided with plans prepared and sealed by Summit Design <br /> and Engineering Services, on May 2, 2016. All construction shall be in <br /> accord with said plans unless modified by a written amendment to said <br /> plans. <br /> 4. A new attachment A, fire marshal permits, is added to the Agreement, a copy of which is <br /> attached hereto. Contractor shall carry out the project in accordance with the permits and shall <br /> schedule inspections as required. Standard and customary work not specified in the Agreement <br /> but required to meet applicable codes and permit conditions shall be carried out by Contractor at <br /> no additional cost to Owner. <br /> 5. Section 13 of the Original Agreement is deleted and a new Section 13 inserted as follows: <br /> 13. COMPLIANCE WITH LAW/GOVERNING LAW <br /> Both parties agree that this Agreement shall be governed by the laws of the State of North <br /> Carolina and any action brought under this Agreement shall be brought in the General <br /> Court of Justice of the State of North Carolina in Orange County. Contractor shall at all <br /> times remain in compliance with all applicable local, state, and federal laws, rules, and <br />