Orange County NC Website
MECHANICAL PERMIT FEE COMPARISON <br /> ORANGE COUNTY AND SURROUNDING JURISDICTIONS <br /> The following, comparison is based on the construction of a single-family <br /> residential dwelling served by a heat pump (heating/cooling) with a capacity <br /> of 100,000 BTU. The estimated cost of the unit is $2,500. <br /> JURISDICTION ' FEE • <br /> % <br /> CHAPEL HILL °/ • $ 25.00 • <br /> CARRBORO (2) 23.50 • <br /> ORANGE COUNTY 40.00 Proposed - Same • <br /> DURHAM (4) . 15.00 <br /> (5) <br /> DURHAM COUNTY S 36.00 <br /> RALEIGH (6) 5 . 36.00 <br /> WAKE COUNTY (7) 20.00 <br /> BURLINGTON (8) 10.00 <br /> (9) <br /> ALAMANCE •COUNTY 30.00 <br /> '00) <br /> CHATHAM COUNTY 32.00 <br /> PERSON COUNTY ( 11) 30.00 <br /> NOTES: ( I) $ 1/Heat Pump + $ .12/Rough-In and Final Inspections <br /> (2) $ 1.50/Heat Pump + $ 12/Rough-In and Final Inspections <br /> (3) .$ 40/Mechanical component and system • <br /> (4) $ 15/Installation with exposed ductwork/components <br /> (5) $ 36 Flat rate <br /> (6) $ 36 Flat rate <br /> (7) $ 20 Flat rate <br /> (8) $ 10/$0-$3000 Installation Cost <br /> (9) $ .0003/BTU * <br /> • ( 10) Combined heat and, air - $32 Flat rate <br /> (.11) $ .0003/BTU <br /> • <br /> • <br />