Browse
Search
Agenda - 07-07-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 07-07-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2016 3:34:30 PM
Creation date
9/22/2016 2:07:59 PM
Metadata
Fields
Template:
BOCC
Date
7/7/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> 1. Install extension to pump shaft. <br /> 2. Install siphon to control downstream flow. <br /> 3 . Modify existing trash guards at pump intake. <br /> The measures would seek to conserve and provide for a safe water <br /> supply. The total cost would be $21, 000 (matching funds: State <br /> $10,500, Town of Hillsborough $10,500) . <br /> Corporation Lake <br /> 1. Install a six inch meter ($2,500) at the point of the inter <br /> connection of Orange-Alamance Water System and the Town of Mebane Water <br /> System and a 12 inch meter ($10, 000 at the point of interconnection with <br /> the Graham Water System) . <br /> 2 . Install siphon to control downstream flow ($1,200) . <br /> Conservation of the water supply would be achieved at a cost of <br /> $13 ,700 (matching funds: State $6,850, Orange-Alamance $6,850) . Orange <br /> Water and Sewer Authority (OWASA) . <br /> 1. Design of booster pump. <br /> 2 . Acquire site for pump station. <br /> 3 . Acquire booster pump. <br /> These measures would assist OWASA in transferring water to <br /> Hillsborough during times of severe drought. The total cost would be <br /> $219, 000 (matching funds: State $109, 500, OWASA $109,500) . <br /> Reservoir Study <br /> 1. Conduct reservoir study of Seven Mile Creek and west side of <br /> the Upper Eno River at a cost of $60, 000 (matching funds: State <br /> $30, 000, local $30, 000) . <br /> Land Acquisition for Reservoir <br /> 1. Acquire land for an additional reservoir site totalling <br /> $91,200 (matching funds: State $45, 600, local $45, 600) . <br /> BE IT FURTHER RESOLVED by the Orange County Board of Commissioners that <br /> the Board fully recognizes Senate Bill 2 grant funds must be matched <br /> with local funds at the amount of $242,450 as above indicated. <br /> Cost Breakdown for Water Projects <br /> Lake Ben Johnston <br /> 1. Install extension to pump shift. $ 9, 000 <br /> 2. Install siphon to control downstream flow. 1,200 <br /> 3 . Modify existing trash guards at pump <br /> intake. 10,800 <br /> Subtotal $21, 000 <br /> Corporation Lake <br /> 1. Install six and twelve inch meters at the <br /> point of the inter-connection of Orange- <br />
The URL can be used to link to this page
Your browser does not support the video tag.