Orange County NC Website
0 <br /> twOOD PAASES AND DEVELGPAEN1 COSTS <br /> PHASE I <br /> £5 UNITS ON HEARTWOLw DRIVE <br /> ROADS: Sd4,4A04).00 <br /> WATER: 36.000.00 <br /> ELECTRICITY: 10,000.00 <br /> SIGN: 1,000.00 <br /> TOTAL 081,000.00 <br /> ============= ================== <br /> PHASE II <br /> 14 UNITS BLACKWOOD 24TN ROAD <br /> ROADS: 074,000.00 - <br /> WATER: 12.000.00 <br /> ELECTRICITY: 3,200.00 <br /> MODIFY LAKE. PICNIC AREA 6,000.00 <br /> TRAIL AROUND LAKE <br /> TOTAL 097,200.0o <br /> PHASE III <br /> 4 UNITS, LAtiE, COMM isLiJG - <br /> ROADS: <br /> WATER: 2,0u0.00 <br /> ELECTRXcITY: 2,500.00 <br /> COMMUNITY GARDEN 3,500.00 <br /> COhMUNITy auILDING 60,000.00 <br /> TOT LOT, CAMPING SITES 4,000.00 <br /> DOCK <br /> TOTAL <br /> s92,000.00 <br /> a= <br /> GRAND 7GTAL: THREE PHASES 470,200.00 <br /> .aa aaaa. <br /> THE TuTAL DEVELGPMmNT COSTS ARE SU8SPANTIAL: YriERcr , IT IS ItiCESSARY <br /> Foa THE :.:,,,..)CCESS OF THE tdRUJECT TO PnASE 11-1 COST:c, Ams B%:iNDING. <br />