Orange County NC Website
19q <br /> Cost Breakdown for Water Projects <br /> Lake Orange <br /> 1. Install rigid flashboard system across the <br /> present spillway crest. <br /> 2. Cut shore line and back fill developed lots. $24, 000 <br /> 3 . Raise peers on p 16, 000 <br /> private lots. 15,000 <br /> 4. Raise boat house and construct retaining wall. 25, 000 <br /> 5. Raise road height on west side of Lake. <br /> 10, 000 <br /> Subtotal $90,000 <br /> Lake Ben Johnson <br /> 1. Install extension to pump shaft. <br /> 2. Install siphon to control downstream flow. $ 9, 000 <br /> 3 . Modify existing trash guards at pump intake.um intake 1,200 <br /> 10,800 <br /> Subtotal $21, 000 <br /> Corporation Lake <br /> 1. Install six and twelve inch meters at the point <br /> of the inter-connection of Orange-Alamance Water <br /> system and the Town of Mebane Water System and <br /> Graham Water System. <br /> 2. Install siphon to control downstream flow. $11,500 <br /> 1,200 <br /> Subtotal $13,700 <br /> Orange Water and Sewer Authority (OWASA) <br /> 1. Design of booster of pump. <br /> 2. Site acquisition for pump station. $11,000 <br /> 3 . Acquisition of booster pump. 95, 000 <br /> 195,000 <br /> Subtotal $219, 000 f, <br /> Reservoir Study <br /> Subtotal $60,000 <br /> Land Acquisition for Reservoir <br /> Subtotal $91,200 <br /> Total $484,900 <br /> Senate Bill 2 Allocation <br /> $242,450 <br /> Local Match <br /> $242,450 <br /> Total $484,900 <br />