Orange County NC Website
19e- <br /> 2 . Acquire site for pump station. <br /> 3 . Acquire booster pump. <br /> These measures would assist OWASA in transferring water to <br /> Hillsborough during times of severe drought. The total cost would be <br /> $219, 000 (matching funds: State $109,500, OWASA $109,500) . <br /> Reservoir Study <br /> 1. Conduct reservoir study of Seven Mile Creek and west side <br /> of the Upper Eno River at a cost of $60, 000 (matching <br /> funds: State $30, 000, local $30, 000) . <br /> Land Acquisition for Reservoir <br /> 1. Acquire land for an additional reservoir site <br /> totalling(matching funds: State $45, 600, local $45, 600) . g <br /> BE IT FURTHER RESOLVED by the Orange County Board of Commissioners <br /> that the Board fully recognizes Senate Bill 2 grant funds must be <br /> matched with local funds at the amount of $242,450 as above <br /> indicated. <br /> 1 <br />