Orange County NC Website
ORANGE COUNTY 05' <br /> BOARD OF COUNTY COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> MEETING DATE JUNE 17, 1986 <br /> ACTION AGENDA <br /> ITEM Fil <br /> SUBJECT: ORANGE GROVE - PRELIMINARY PLAN <br /> *********************************************************************** <br /> DEPARTMENT: PLANNING PUBLIC HEARING: YES . NO <br /> *******************************************************a�**** ** ******** <br /> ATTACHMENTS: CONTACT: EDDIE KIRK <br /> VICINITY MAP <br /> APPLICATION <br /> APPLICANT'S LETTER <br /> PRELIMINARY PLAN <br /> STORMWATER MANAGEMENT PLAN <br /> AGENCY COMMENTS <br /> 5-13-86 DRAFT PLANNING BOARD MINUTES <br /> TELEPHONE NUMBERS: <br /> Hillsborough 732-81181 <br /> Chapel Hill 967-9251 <br /> Durham 688-733t <br /> Mebane 227-2031 <br /> *********************************************************************** <br /> PURPOSE: To further consider the Preliminary Plan for Orange Grove <br /> Subdivision for approval . <br /> This item was tabled on May 20, 1986 to receive further <br /> information on revised lot arrangements to address conditions <br /> # 1 and 3 (See RECOMMENDATION) . <br /> To receive the Planning Board ' s recommendation_ <br /> NEED: Robert Moul has requested approval of a subdivision for 35 .35 <br /> acres of land located off Orange Grove Road (SR 1006) in <br /> Bingham Township . The property in question is known as Lot <br /> 21 of Tax Map 5 . It is owned by James Paliourus. The <br /> purpose of the request is to permit construction of an eight <br /> (8) lot subdivision, which will be an extension of an <br /> existing 11 lot subdivision known as Orange Grove Mobile Home <br /> Estates. <br /> A public road to be constructed to state standards is <br /> proposed to serve the subdivision . The existing private road <br /> serving Orange Grove Mobile Home Estates is to upgraded to <br /> state standards and dedicated public. The applicant proposes <br /> to dedicate a 60' right-of-way although only a 50' right-of <br /> way dedication is required for a public road . The applicant <br /> is aware of the discrepancy. The applicant has revised the <br /> preliminary plan to indicate the manner in which <br /> the existing lots in Orange Grove Mobile Home Estates are to <br /> be combined so that adequate right-of--way for a public road <br /> can be provided through this existing subdivision . The <br /> applicant owns all of the lots in the existing subdivision <br /> except Lots #1 -3 shown on the revised site plan . He is <br />