Browse
Search
Agenda - 06-17-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 06-17-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2016 12:04:43 PM
Creation date
9/22/2016 11:56:01 AM
Metadata
Fields
Template:
BOCC
Date
6/17/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/---- Orange Water and Sewer Authority <br /> Road 21 C <br /> I OWASA l P.O406. Box Jonas 366 Ferry <br /> Carrboro, NC 27510 <br /> (919) 968-4421 <br /> April 15, 1986 <br /> Mr. Eddie Kirk <br /> Planner <br /> Orange County <br /> Hillsborough, NC 27278 <br /> Dear Mr. Kirk: <br /> SUBJECT: HOMESTEAD HEIGHTS <br /> A review of the preliminary water and sewer drawings for the above referenced <br /> project has been completed by this office. <br /> Based upon this review, the following items require attention in development <br /> of the construction drawings: <br /> 1. A 12" gravity sewer must be extended along Bolin Creek to this property. <br /> 2. A 12" water line must be extended along Homestead Road from its <br /> intersection with Seawell School Road. <br /> 3. All dead end water lines must end with a blow off assembly. <br /> 4. All water line intersections must be fully valved. <br /> 5. Requirements for fire flow demands should be determined. <br /> 6. All off site easements must be acquired prior to plan approval. <br /> 7. Detailed construction plans showing plan & profile views of the water <br /> and sewer lines must be submitted for approval by OWASA and the <br /> appropriate State regulatory agencies. <br /> 8. Water and sewer lines must be installed within a public right of way <br /> or a 30' easement dedicated to OWASA. <br /> Further comments will be provided at the time detailed construction drawings <br /> are submitted for approval. <br /> Should you have further questions regarding the utility system serving this <br /> project please do not hesitate to call this office. <br /> With best regards, <br /> John W. Greene <br /> . Chief Engineer <br /> so <br /> An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.