Browse
Search
Agenda - 05-27-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 05-27-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2016 10:00:47 AM
Creation date
9/22/2016 9:57:01 AM
Metadata
Fields
Template:
BOCC
Date
5/27/1986
Meeting Type
Special Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Planning Board 086 <br /> Page Two <br /> April 21, 1986 <br /> 3. The ground surface around the well must be sloped so that water <br /> will drain away from the well. <br /> 4. Final approval of the well as a source of public water supply <br /> shall be based on the chemical and bacteriological quality of <br /> the water. <br /> Failure to comply with the above-listed provisos may result in the disapproval <br /> of the well sites. <br /> Upon receipt of this letter and a well construction permit from the Division <br /> of Environmental Management, you may proceed with drilling operations. Upon com- <br /> pletion of the well construction, a twenty-four (24) hour capacity test must be <br /> conducted in accordance with requirements of the North Carolina Well Construction <br /> Regulations and Standards. Copies of the well completion record, water analysis, <br /> pumping test, and three (3) copies of documents and exhibits as outlined in the <br /> "Guide for Obtaining Approval of Public Water Supply Systems" must be submitted <br /> to the Engineering Planning Branch, Division of Health Services in Raleigh. <br /> Until the plans and specifications have been reviewed and approved by the <br /> Division of Health Services, no construction on any portion of the water system, <br /> other than the wellhead, is to be carried out. The detailed plans and specifi- <br /> cations must be prepared by an engineer licensed to practice in the state of North <br /> Carolina. <br /> Since January 1972, continuous disinfection of public water systems is also <br /> a requirement. <br /> If additional assistance or information is desired from this office, please <br /> do not hesitate to call on us. <br /> Sincerely, <br /> 671), 61-4°0-Z6C‘7 14/0-get,:a9- <br /> Robert E. Hallisey <br /> Environmental Technician <br /> Water Supply Branch <br /> Environmental Health Section <br /> REH/ps <br /> cc: Mr. W. E. Venrick <br /> Mr. Charles E. Rundgren <br /> Mr. F. K. Yarborough <br /> Orange County Health Department <br /> Mr. John Hartley <br />
The URL can be used to link to this page
Your browser does not support the video tag.