Orange County NC Website
0 7,1i. <br /> LAKE ORANGE SUBDIVISION PAGE 2 <br /> IMPACT: Development of this subdivision would have minimal impact <br /> on the area. The projected traffic generation for this <br /> subdivision is approximately 76.08 (9.51 trips x 8 lots) <br /> trips per day. The 1981 (most current) NCDOT traffic <br /> count for SR 1323, determined from both directions, is 200 <br /> average daily trips. <br /> RECOMMENDATION: The Planning Board recommends approval of the <br /> Preliminary Plan. <br />