Orange County NC Website
031 <br /> f. Provide 13 parking spaces to serve the multifamily <br /> recreation facilities. <br /> g. Install a fence around the pool for safety reasons. <br /> h. Wherever appropriate, provide handicapped parking spaces <br /> and ramps. Construct all walking and bicycle paths on <br /> slopes no greater than 5%. <br /> 28. All plans for drainage, soil erosion and sedimentation <br /> control shall be reviewed and approved by Orange County <br /> and the site plan modified accordingly to satisfy the <br /> Soil and Erosion specifications. In addition, Orange <br /> County shall Inspect the installation of control devices <br /> and the on-going work for the total project. The <br /> project shall at all times meet the requirements of the <br /> Orange County Soil Erosion and Sedimentation Control <br /> Ordinance. <br /> 29. Construct and maintain stormwater devices to control the <br /> peak rate of runoff from the commercial and multifamily <br /> tract. The detention devices shall be designed and <br /> constructred so that the peak rate of runoff after <br /> development will not exceed the predevelopment rate for <br /> a 20 year 24 hour storm and for storms of greater <br /> intensity. <br /> 30. Grading on the site shall be kept to a minimum. in lieu <br /> of planted landscaping, existing vegetation shall be <br /> maintained between units. Clearing shall only be <br /> conducted for purposes of installing improvements. <br /> 31 . Final landscaping plans shall be submitted and approved <br /> prior to the Initiation of construction activity. <br /> 32. A landscape architect shall be employed by the applicant <br /> to prepare a landscaping/screening plan for the designat <br /> ed 100' buffer area. The plan must be prepared in <br /> consultation with adjacent property owners and approved <br /> by Orange County Planning Department. The plan shall be <br /> prepared following a survery of the existing vegetation <br /> of the buffer area and must identify and specify the <br /> retention of specimen trees twelve inches or more in <br /> diameter, provide for year round screening and include <br /> implementation details and schedules. At a minimum the <br /> screening shall be opaque from ground to a height of at <br /> least six (6) feet, with intermittent visual obstruction <br /> from the opaque portion to a height of a least twenty <br /> ( 20) feets. (ADDED BY PLANNING BOARD 2--4-86) . <br /> 33. That all signs be erected in compliance with Article 9 <br /> Signs following issuance of a building permit and prior <br /> to the issuance of a Certificate of Occupancy for any <br /> unit. No sign may be erected within the signt triangles <br /> for the entranceways to the development. <br /> 34. That all structures be erected in compliance with <br /> applicable building codes following submittal for and <br /> issuance of building permits. <br />