Orange County NC Website
221ORANGE COUNrI'x PLANNING DEPARTMENT <br /> IIILLSEOROUGR <br /> NORTH CAROLINA <br /> 27278 <br /> b All •. <br /> _ y <br /> •`g, dac•N <br /> MEMORANDUM <br /> TO: Jane Atwater, Planner //'' '' <br /> FROM; Warren Faircloth, Erosion Control Officer <br /> SUBJECT: Stormwater Management Plan for Durell <br /> • <br /> Dobbins Subdivision <br /> DATE: April 7 , 1986 <br /> This stormwater management plan proposes to control <br /> the peak rate of runoff by the use of a detention <br /> structure to capture the runoff from the development , <br /> hold it and release it at a rate that does not exceed <br /> the predevelopment rate of runoff. <br /> design will achieve this goal . <br /> The proposed <br /> On page two of the plan , it is stated that the plan 's <br /> purpose is to capture the increased runoff and <br /> infiltrate it on the site; however , the proposed <br /> device is not an infiltration structure but a deten- <br /> tion structure to only slow the rate of runoff. <br />