Orange County NC Website
21� <br /> LAKE ORANGE SUBDIVISION <br /> PAGE 2 <br /> IMPACT: Development of this subdivision would have minimal impact <br /> on the area. The projected traffic generation for this <br /> subdivision is approximately 76.08 (9.51 trips x 8 lots) <br /> trips per day. The 1981 (most current) NCDOT traffic <br /> count for SR 1323,sdetermined from both directions, is 200 <br /> average daily trip . <br /> RECOMMENDATION. The Planning Board recommends approval of the <br /> Preliminary Plan. <br />