Orange County NC Website
156 <br /> ORANGE HIGH SCHOOL RENOVATION/EXPANSION - <br /> ESTIMATED COST FOR EACH POSSIBLE BID AWARD <br /> LOW ARCHITECT 3% TOTAL <br /> FEE F PROJECT ESTIMATED <br /> BID <br /> CONTINGENCY NGENCY COORDINATOR COST <br /> 1. Base only $2,135,288 $ 149,500(1) <br /> 2. Base & Alt. 1 $ 65,000 $ 30,000 $2,379,788 <br /> 2,324,663 159,500(2) 70,000 30,000 2,584,163 <br /> 3. Base & Alt. 2 2,498,467 <br /> 171,500(2) 75,000 30,000 2,774,967 <br /> 4. Base & Alt. 3 2,200,288 ' <br /> 154,000(1) 66,000 30,000 2,450,288 <br /> 5. Base & Alts_• ; & 2 2,698,551 179,500(3) 81,000 <br /> 6. Base & A1ts. 1 & 3 2,387,911 30,000 2,989,051 <br /> 164,000(2) 72,000 30,000 2,653,911 <br /> 7. Base & Alts.1 ,2, ' <br /> & 3 2,761,771 184,000(3) 83,000 <br /> 8. Base & Alts. 2&3 2,561,687 171,000(3) 30,000 3,058,771 <br /> 77,000 30,000 2,839,687 <br /> (1) at 7% <br /> (2) at 6.85% <br /> (3) at 6.65% <br /> Alternative 1: Media Center - Wing A <br /> Alternative 2: Auxilary Gymnasium <br /> Alternative 3: Surface Treatment to Parking Lot and Driveway <br />