Browse
Search
Agenda - 05-05-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 05-05-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2016 9:31:02 AM
Creation date
9/22/2016 9:19:27 AM
Metadata
Fields
Template:
BOCC
Date
5/5/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1411 <br /> the parking lot and driveway. The Glenwood and Estes Hills <br /> projects could likewise be completed at the $1.8 million cost <br /> estimate based upon two alternatives. One is to reschedule <br /> other projects as shown. If the projects cannot be rescheduled <br /> then alternative two would apply which is to seek additional <br /> sources of revenue (bond issue, extension of the property tax <br /> dedicated to school capital, an additional 1/2 sales tax, a <br /> school impact fee funding from the General Fund due to lessened <br /> debt service requirements) . Apart from the cost increases in <br /> the two school system projects there are other capital needs not <br /> yet reflected in the Long Range Capital Financing Plan which <br /> could bring about the need for other revenue. <br /> RECOMMENDATION(S) : <br /> (1) Adopt the accompanying resolution authorizing the school <br /> system to award bids and execute contracts for the base <br /> project plus the surfacing of the parking lot and driveway. <br /> (2) Adopt the funding policy called for in Alternative No. 1 for <br /> the School Capital Reserve Fund Long Range Plan and Budget <br /> whereby the High School and the Multipurpose Space projects <br /> are completed within the revenue structure already in <br /> existence in the plan. This would be accomplished by <br /> rescheduling the remainder of the Chapel Hill-Carrboro <br /> System projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.