Browse
Search
Agenda - 05-05-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 05-05-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2016 9:31:02 AM
Creation date
9/22/2016 9:19:27 AM
Metadata
Fields
Template:
BOCC
Date
5/5/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• L4, J ib <br /> 1986 - 1987 <br /> TOWN OF CARRBORO <br /> TRANSPORTATION IMPROVEMENTS PROGRAM E40 STATE ROAD IMPROVEMENTS 4-3 -8(0 <br /> First Year Priorities <br /> 1) Install a traffic signal at the intersection of 54 Bypass and 54 Business. <br /> 2) Widen the following streets to 36 feet with curb and gutter and bike lanes: <br /> a) Hillsborough Road from Main Street to North Greensboro Street, <br /> b) North Greensboro from Estes Drive to Hillsborough, <br /> . c) North Hillsborough from Greensboro to the. Town limits, and, <br /> d) Main Street from Hillsborough Road to 54 Bypass. <br /> 3) Widen the bridge on Smith Level Road over Morgan Creek to four lanes. <br /> 4) Implement the recommendations of the Chapel Hill/Carrboro Signalization <br /> Study to purchase and install improved signal equipment in the Town. <br /> Second Year Priorities . - . <br /> 1) Widen Smith Level Road to five lanes from Merritt Mill. Road to Cuibreth <br /> Road. <br /> 2) Widen 54 Bypass to a duel-lane facility from 15-501 to the intersection <br /> of 54 West and Old Fayetteville Road (SR 1107 & SR 1937). <br /> 3) Widen Estes Drive to four lanes from Airport Road to North Greensboro <br /> Street, and include bike lanes. <br /> Third Year Priorities <br /> 1) Widen Smith Level Road to four lanes from Cuibreth to U.S. 15-501. <br /> 2) Widen 54 West between the Bypass intersection and the Old Fayetteville <br /> Road intersection. <br /> 3) Widen Jones Ferry Road to four lanes from Old Fayetteville Road to the <br /> Bypass. <br /> Long Range Priorities <br /> 1) The extension of Carr Street from the Chapel Hill/ <br /> Carrboro municipal limits to intersect with Main Street and Jones Ferry <br /> Road. The Carr Street extension will be built to a 48' roadway cross- <br /> section. <br /> 2) Improve Main Street to three lanes from Roberson Street to Jones Ferry Road. <br /> 3) Widen Main Street to 36' with curb and gutter from Jones Ferry Road to <br /> Weaver Street. <br /> 4) Widen Greensboro Street to four lanes from Estes Drive to Merritt Mill Road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.