Browse
Search
Agenda - 04-07-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 04-07-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2016 12:23:55 PM
Creation date
9/20/2016 2:54:24 PM
Metadata
Fields
Template:
BOCC
Date
4/7/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> CO PY <br /> ARTICLE 4 <br /> PROGRESS PAYMENTS <br /> 4.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment <br /> issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Con- <br /> tractor as provided in the Contract Documents for the period ending the 30th, day of the <br /> month as follows: <br /> (Here insert payment procedures and provision for retainage,if any.) <br /> 90% payment for work completed and stored materials with <br /> remaining 10% retained until final completion. <br /> 4.2 Payments due and unpaid under the Contract Documents shall bear interest from the date payment is due at the <br /> rate entered below,or in the absence.thereof, at the legal rate prevailing at the place of the Project. <br /> (Here insert any rate of interest agreed upon.) <br /> (Usury laws and requirements under the Federal Truth in Lending Act, similar state and local consumer credit laws and other regulations at the <br /> Owner's and Contractor's principal places of business, the location of the Project and elsewhere may affect the validity of this provision. Specific <br /> legal advice should be obtained with respect to deletion, modification, or other requirements such as written disclosure or waivers.) <br /> ARTICLE 5 <br /> FINAL PAYMENT <br /> 5.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be paid by the Owner to the <br /> Contractor when the Work has been completed, the Contract fully performed,and a final Certificate for Payment <br /> has been issued by the Architect. <br /> ARTICLE 6 <br /> ENUMERATION OF CONTRACT DOCUMENTS <br /> 6.1 The Contract Docu tents, which constitute the entire agreement between the Owner and the Contractor, are <br /> listed in Article 7 and,except for Modifications issued after execution of this Agreement,are enumerated as follows: <br /> (List below the Agreement, the Conditions of the Contract,(General,Supplementary, and other Conditions). the Drawings, the specifications, and <br /> any Addenda and accepted alternates, showing page or sheet numbers in all cases and dates where applicable.) <br /> General Conditions, A201 <br /> Specifications, Pages 1 thru 48, dated December 2, 1985 <br /> Addendum 1 , dated January 2, 1986 <br /> Addendum 2, dated January 23, 1986 <br /> Plans, Sheets 1 thru 6, dated December 2, 1985 <br /> Advertisements <br /> Certificates of Insurance: Worker' s Compensation, General <br /> Liability, Builders All Risk, Automobile Liability <br /> Bonds: Performance, Payment <br /> Power of Attorney <br /> Notice of Award <br /> Notice to Proceed <br /> Preaudit Statement <br /> Statement of Values <br /> AIA DOCUMENT A107 • ABBREVIATED OWNER-CONTRACTOR AGREEMENT • EIGHTH EDITION • APRIL 1978 • Aim <br /> @ 1978 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D_C. 20006 A107-1978 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.