Browse
Search
Agenda - 03-25-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 03-25-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2016 12:16:15 PM
Creation date
9/20/2016 12:01:33 PM
Metadata
Fields
Template:
BOCC
Date
3/25/1986
Meeting Type
Public Hearing
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Task 4: Final Report. At the conclusion of Task 3 we shall prepare <br /> a written report that will accomplish two objectives. First, the report <br /> will completely describe the activities in which we have engaged during the <br /> study. It will describe the analysis and data, as well as the liaison <br /> efforts. Second, the final report will focus on an in-depth evaluation of <br /> the organizational options and will provide guidance on which service and <br /> TSM options appear to be most feasible for the Triangle area. This part of <br /> the report will be a revised version of the interim report that was used in <br /> the second round of public officials meetings. It will describe each <br /> organizational option, and it will provide in a matrix form a detailed <br /> evaluation of the advantages and disadvantages of each organizational <br /> option. Among the evaluation criteria will be the following attributes: <br /> operations capabilities; ability to provide area-wide service; ability to <br /> raise capital ; and accountability to local elected officials. The service <br /> and TSM options will be outlined and evaluated according to relative <br /> capital and operating requirements, effectiveness in meeting transportation <br /> needs, and liklihood of private sector participation. This report will be <br /> provided in draft form to the Department of Transportation for review and <br /> will then be revised. A final camera-ready copy will be provided at the <br /> conclusion of the project to the Department of Transportation. <br /> " <br />
The URL can be used to link to this page
Your browser does not support the video tag.