Browse
Search
Agenda - 03-18-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 03-18-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2016 12:19:09 PM
Creation date
9/20/2016 11:55:18 AM
Metadata
Fields
Template:
BOCC
Date
3/18/1986
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- " (V Distribution to <br /> ORDER OWNER • - • 436 <br /> ARCHITECT •. • ® - <br /> AlA DOCUMENT C701 • CONTRACTOR. El _ <br /> - . FIELD .. ❑ <br /> OTHER. . ® FILE . . <br /> PROJECT: RENOVAT IONS I CHANGE ORDER NUMBER: P.03 <br /> (name,address) ORANGE COUNTY H I sTOR I c. . - <br /> COURTHOUsE INITIATION DATE: MARCH 10 1986 <br /> TO (Contractor): HILLSBOROt,1CH. NC. . <br /> INDUSTRIAL MAINTENANCE AND ARCHITECT'S PROJECT NO: cc.81 <br /> SUPPLY, INC CONTRACT FOR: <br /> PLUM INri= <br /> P.O. BOX 513 <br /> HAW RIVER NC 27258 . <br /> CONTRACT P.O. ID NO. 7740 CONTRACT DATE: MARat 20. 1985 <br /> You are directed to make the following changes in this Contract: ' <br /> t <br /> Extend the Contract Time by thirty eight (38) calendar days to <br /> allow for the authorized postponement of painting and <br /> finishing operations caused by unsuitable weather conditions <br /> which hampered proper performance of such work, as directed by <br /> the Architect. <br /> The adjusted Date for Substantial Completion shall be April <br /> 17, 1986 <br /> Not valid until signed by both the Owner and Architect. <br /> Signature of the Contractor indicates his agreement herewith. including any adjustment in the Contract Sum or Contract Time. <br /> The original (Contract Sum) (Guaranteed-Mazirnum Cost) was $ 13 000.00 <br /> Net change by previously authorized Change Orders S 3 313.89 • <br /> The (Contract Sum) (Cu t.a*teed•Mexif'r rm Cost) prior to this Change Order was $ 15 313,89 , <br /> The (Contract Sum) (Guaranteed Mayors wm-Gast) will be (ix d) (dear4 d) (unchanged) • <br /> by this Change Order $ 0 • <br /> The new(Contract Sum) ( ) including this Change Order will be , $ 1 s 313.89 • <br /> The Contract Time will be (increased) (decreased) (unchanged) by ( 38 ) Days:- <br /> The Date of Substantial Completion as of the date of this Change Order therefore is APRIL 17 1 986 <br /> Authorized: <br /> ROMAN KOLOD I J ' JAMES WEBB INDUSTRIAL MAINTENANCE AND COUNTY OF ORANGE <br /> ARCHITECT ARCHITECTS CONTRACTOR SUPPLY, INC. OWNER NORTH CAROLINA <br /> Address Z 01 E ROSEMARY 5T Adtlres. P.O. BOX 513 Address t 0 6 E MARGARET LANE <br /> EL HI LL NC 275 1 4 1-IAW RIVER NG 27258 _ - r-41 LL$BOROUGH NC <br /> c- <br /> i <br /> BY �� BY ��C..�.. "\--,r.,. \,__ BY <br /> DATE AtAit (' DATE - DATE <br /> MA DOCUMENT C701 • CHANCE ORDER • APRIL 1976 EDITION • AIAR • O 1978 <br /> THE AMERICAN INSTITUTE Or ARCHITECTS,1735 NEW YORK AVE., N_W..WASHINGTON,D.C.20006 G701-1978 <br />
The URL can be used to link to this page
Your browser does not support the video tag.