Browse
Search
Agenda - 03-18-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 03-18-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2016 12:19:09 PM
Creation date
9/20/2016 11:55:18 AM
Metadata
Fields
Template:
BOCC
Date
3/18/1986
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
032 <br /> ORANGE COUNTY <br /> BOARD OF COMMISSIONERS Action Agenda <br /> ACTION AGENDA ITEM ABSTRACT Item No. fiA_ <br /> Meeting Date: MARCH 18, 1986 <br /> SUBJECT: TIME EXTENSION FOR OLD COURTHOUSE CONTRACT--CHANGE ORDER <br /> DEPARTMENT: COUNTY MANAGER PUBLIC HEARING: _Yes X No <br /> ATTACHMENT(S) : INFORMATION CONTACT: MANAGER'S <br /> OFFICE, X501 <br /> TELEPHONE NUMBER: <br /> YES Hillsborough - 732-8181 <br /> Chapel Hill - 968-4501 <br /> Mebane - 227-2031 <br /> Durham - 688-7331 <br /> PURPOSE: Consider granting a further extension of the contract time. <br /> NEED: While the previous extension of contract time (from October 1985 <br /> to March 10, 1985) was due to unforeseen concrete work and <br /> asbestos removal there is now a need to grant additional time <br /> for interior painting. The months of having the building open <br /> with no heat has caused a build up of moisture which prevents <br /> paint adhesion. The only way to reduce the moisture is for the <br /> new heat pumps to be in operation. The heat pumps were <br /> installed on time yet would not function properly. It took a <br /> period of time to determine that the cause of the problem was a <br /> defective flow valve in the existing lines of the County which <br /> hampered the circulation of water to the water pumps. <br /> The architect recommends the granting of additional time. <br /> IMPACT: A delay in completion time in order to secure quality work in <br /> the painting element. <br /> RECOMMENDATION(S) : <br /> Approve attached change order permitting an April 17, 1986 <br /> completion date. <br />
The URL can be used to link to this page
Your browser does not support the video tag.