Orange County NC Website
• <br /> (1UO3 <br /> • <br /> • <br /> • <br /> • <br /> i 019 <br /> SATISFACTION OF WATERSHED STANDARDS OFF—SITE <br /> ISSUE: To provide for .an approach which involves the use <br /> of a perpetual easement over or ownership of <br /> off—site property to satisfy the impervious surface <br /> and undisturbed area requirements for water. supply <br /> watersheds as provided in the Orange County Zoning <br /> Ordinance. This amendment would address the needs <br /> of the Orange Grove Rural. Fire Department for <br /> expansion of their facilities within the Cane Creek <br /> water supply watershed . <br /> PROPOSED AMENDMENT TO ARTICLE 6 APPLICATION OF DIMENSIONAL <br /> REQUIREMENT AND UNDISTURBED AREA REGULATIONS T <br /> ADD SECTIONS 6 .23 .9 , AND 8 .24.9 Satisfaction of <br /> Watershed Standards Off—Site <br /> Where property proposed for development cannot <br /> meet the impervious surface and/or undisturbed <br /> area requirements prescribed in the Ordinance, an <br /> applicant may satisfy these requirements off—site <br /> within the same water supply watershed as <br /> designated in the Orange County Land Use Plan . <br /> For the purpose of this subsection , "off—site" <br /> shall be defined as : <br /> a) Property in the same ownership as and either <br /> adjoining or separated from the tract being <br /> developed . <br /> b ) Property owned by another individual either <br /> adjoining or separated from the tract being <br /> developed . <br /> Property used to satisfy undisturbed -area <br /> requirements must adjoin the property under <br /> development . <br /> In the case of (b ) , an easement must be provided <br /> which shall : <br /> 1 . run with the land of the subject property <br /> ( and] <br />