Browse
Search
Agenda - 03-05-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 03-05-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2016 11:08:34 AM
Creation date
9/20/2016 11:04:57 AM
Metadata
Fields
Template:
BOCC
Date
3/5/1986
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05c <br /> Jacobs referred to the staff report indicating 431 <br /> additional trips per day. Brunsen responded that the <br /> �y ...,.�. staff projection was low. He projected 760 <br /> additional trips per day but emphasized that the <br /> � '. higher numbers would not change the service level . <br /> Pilkey asked for clarification of the statement by <br /> Warren Faircloth , Erosion Control Officer , on page <br /> 110 of the agenda packet , "I have some questions <br /> about assumptions made in the design that need to be <br /> answered before final approval is given". Collins <br /> responded that Faircloth reviews every subdivision <br /> that comes in on a preliminary basis . Before the <br /> final plat is approved he will look at a detailed <br /> sedimentation plan. What he is saying here is that <br /> before final plat approval is given he wishes to have <br /> his questions about design assumptions answered and <br /> they generally are in the submission of a detailed <br /> plan. <br /> MOTION: Pilkey moved approval with conditions as specified by <br /> , staff. Seconded by Walters . <br /> VOTE: Unanimous . <br />
The URL can be used to link to this page
Your browser does not support the video tag.