Orange County NC Website
r. TABLE 5 PRELIMINARY <br /> U <br /> ;.. tl <br /> 1 6 December 22, 1982 <br /> SUMMARY OF FEDERAL-AID HIGHWAY FUNDS APPORTIONED FOR FY 1985-86 <br /> Federal State <br /> Aid Matching Total <br /> Match Funds Funds Funds <br /> Federal-Aid Program Ratio (Millions) (Millions) (Millions) <br /> Interstate Construction (1) 90/10 $ 50.9 $ 6.8 $ 57.7 <br /> Interstate 4R (1) • 90/10 53.9 7.2 61.1 <br /> Primary 75/25 40.0 14.4 - -:='-54.4 <br /> Primary 4R 26.7 9.6 6.3 <br /> Secondary 75/25 11.7 4.2 X15.9 <br /> Secondary 4R 7.8 2.8 ---'1.0.6 <br /> Urban 75/25 7.1 2.6 = 9.7 <br /> Urban 4R 4.7 1.7 6.4 <br /> Bridge Replacement 80/20 76.3 20.0 - -- 96,3 <br /> Rail/Highway Crossings 90/10 4.6 0.6 - 5.2 <br /> High Hazard Locations 90/10 4.8 0.6 5.4 <br /> Forest Highways 100/0 Unknown - <br /> Public Lands Highways 100/0 Unknown - <br /> Minimum Allocation. <br /> (85% Floor) (2) Var. 20.7 7.4 28.1 <br /> Appalachian Development 80/20 Unknown <br /> TOTAL $ 309.2 <br /> $ 77.9 $ 387.1 <br /> NOTES <br /> (1) Interstate funds are available for use a year in advance of the <br /> apportionment year. <br /> (2) Minimum allocation is a fund to assure the State a minimum of 85. percent <br /> return of the State's contribution to the Federal Highway Trust Fund, <br /> other than the Mass Transit Account. <br /> • <br /> 1/6/83 <br /> o� <br /> • <br />