Browse
Search
Agenda - 02-24-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 02-24-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2016 11:37:44 AM
Creation date
9/20/2016 10:50:55 AM
Metadata
Fields
Template:
BOCC
Date
2/24/1986
Meeting Type
Public Hearing
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
00014 <br /> structures , and devices shall be so planned, <br /> designed, and constructed as to provided protec- <br /> tion from accelerated erosion and sedimentation <br /> from the calculated maximum peak rates of runoff <br /> from 111 ten-year frequency storm. . . . <br /> 11 . Page 12 , Section 8(e) : the word "is" after 20, 000 <br /> square feet has been changed to "are". <br /> 12 . Page 19, Section 13 : the words "any provision of <br /> the Ordinance , the Act , or any order adopted <br /> pursuant to this Ordinance or the Act" have been <br /> added at the end of the first sentence. The <br /> second sentence has been - <br /> changed to require <br /> "installing" as well as maintaining erosion <br /> control devices and to refer to the "person in <br /> possession or control of the land" as well as the <br /> land owner. <br /> Section 13 <br /> During the development of a site , the person <br /> engaged in or conducting the land-disturbing <br /> activity shall be responsible for installing and <br /> maintaining all temporary and permanent erosion <br /> control measures and facilities as required by <br /> the approved or revised Erosion Control Plan, WU <br /> adialaa l.._auLaunn ._ia_lhi .__aslinanaa__QL_hha_Agi., <br /> The responsibility for final illing____nnd <br /> WAiniginla permanent erosion and sedimentation <br /> control measures and facilities after completion <br /> of the site development shall lie with the land <br /> owne r QL_RguQII__lII.�_R Qx����LQn_QL_�5211 tQ1_2i_ ha <br /> land except facilities and measures installed <br /> within road or street rights-of-way or easements <br /> accepted for maintenance by a government agency . <br /> 13 . Page 20 , Section 15(a) : the reference to Section <br /> 5. 1 , which does not exist , has been deleted. A <br /> Section 5. 1 , which was essentially the same as <br /> Section 5 , was proposed as part of the amendments <br /> relating to University Lake . However , Section <br /> 5.1 was dropped, but the reference to it was <br /> inadvertently left in the Ordinance . <br /> 14. Page 20 , Section 15(b) : the phase "written notice <br /> to comply" has been changed to "written notice of <br /> violation" . <br /> Section 15(b) <br /> The Erosion Control Officer will serve upon the <br /> landowner written notice QL___yiQlnliQn by <br /> registered or certified mail . . . <br />
The URL can be used to link to this page
Your browser does not support the video tag.