Browse
Search
Agenda - 02-24-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 02-24-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2016 11:37:44 AM
Creation date
9/20/2016 10:50:55 AM
Metadata
Fields
Template:
BOCC
Date
2/24/1986
Meeting Type
Public Hearing
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
00013 <br /> Section 6 (b) <br /> Ezolio 1__CQn t LQ1__1?1an_geQU .Lgalgnt - Prior to the <br /> commencement of any land disturbing activity that <br /> will result in the uncovering of more than 20 , 000 <br /> square feet of land, the person(s ) aQndhating the <br /> land disturbing activity must prepare and submit <br /> an Erosion Control Plan for the proposed site. <br /> The _Eian_muzi_ba_ .$aTQxgd_and__a_auding_EmLim.1.l. <br /> ab.lainad_ludat_i2_111a_aiazi_a_tha_sliaiathange... <br /> Section 6. 1(a) <br /> Elan.._R€gnaamant - except as otherwise provided <br /> in subsection b. , an erosion and sedimentation <br /> control plan shall be prepared and filed with and <br /> anianytdju the Erosion Control Division. . . <br /> Section 6.1 (b) <br /> P1an_Wa.iyaz - the person(s ) gQnangling the land- <br /> disturbing activity . . . <br /> 6 . Page 9 , Sections 6(b) and 6 . 1(a) : these sections <br /> have been changed to state that not only must a <br /> plan be prepared and submitted but also approved. <br /> Refer to the text of these sections in 5 above. <br /> 7. Page 10, Section 6 . 1(c) : the phase "engaged in" <br /> has been replaced by the word "conducting". <br /> Section 6 . 1(c) <br /> ELQt eation__Qt_ELQueLty - Person(s) =agitating <br /> land-disturbing activity . . . <br /> 8 . Page 11 , Section 7( f) : the word "runoff" has been <br /> inserted between "water" and "resulting" . <br /> Section 7(1 ) <br /> Manngg_at4LmYYnt€t__E1ltiQfi - when the increase in <br /> the peak rates and velocity of storm water <br /> nun4.€1 resulting from . . . <br /> 9. Page 12 , Section 8(c) : the word "is" after <br /> "20 , 000 contiguous square feet " has been changed <br /> to "are" . <br /> 10. Page 12 , Section 8(d) : the phase "calculated peak <br /> rates" has been changed to "calculated maximum <br /> peak rates" and the phase "a ten-year frequency <br /> storm" has been changed to "the ten-year frequen- <br /> cy storm" . <br /> Section 8(d) <br /> Dglien__and__Eaz onmange__dl__Canizal_MgaauLga - <br /> erosion and sedimentation control measures , <br />
The URL can be used to link to this page
Your browser does not support the video tag.