Browse
Search
Agenda - 02-24-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 02-24-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2016 11:37:44 AM
Creation date
9/20/2016 10:50:55 AM
Metadata
Fields
Template:
BOCC
Date
2/24/1986
Meeting Type
Public Hearing
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w.. <br /> • 000_x0 . <br /> - l6 . <br /> oas,•to t .Co th td1 Erosion <br /> did Sedimentation 'Matra Ordinance <br /> r <br /> Vie-correctiO <br /> noting <br /> anima <br /> _ <br /> lbw,- Typographical � ` <br /> 2„ p. 4 Sates 3: the tt�`of Adeavate Erosion Control <br /> oar. Device should have "der responsible. <br /> � conducting the land-disturbing <br /> definition._.,. (r.... . .., at the end of the - . . <br /> i': tine ed guff.:. Area *head also refer <br /> to Section 8(a) as it pertains to buffer zone. <br /> pr. T Section 3 the definition of-Tent ar Storm in the third <br /> linosheuld have "once" inserted between "average", and <br /> f� 6.1(b) these paragraphs would be more <br /> 3. p. 9 Section� o Section (-e)Ch) and 6. <br /> technically adequate if "persons engaged in ...„ and <br /> "'persons responsible for . . .” were replaced.with "person(s) <br /> conducting..." as shown. You have already included a <br /> definition for Person Conductin Land-disturbin Activit <br /> which defines not only the person conducting the activity <br /> but also the person responsible for any violations. <br /> p. 9 Section 6(b) and 6.1(a) although <br /> also planaapprovalhise <br /> died in Section 8(e). it should <br /> sections as well. As they read now only a requirement for <br /> the preparation and submittal. of a plan is stated. <br /> p. 10 Section 6.1(c) change "engaged in" to "conducting". <br /> 4. p. 11 Section 7(f) in the second line insert "runoff" between <br /> "" <br /> "water" and "resulting". <br /> S. p. <br /> 12 Section 8(c) change "is" to "are" as shown. <br /> p. 12 Section 8(d) either change "calculated peak rates" in the <br /> fifth line to "calculated maximum peak rates" or "calculated <br /> discharge" <br /> defined in Section 3. <br /> Change "a ten-year frequency storm" to "the ten-year <br /> frequency storm". <br /> p. <br /> 12 Section 8(e) change "is" to "are" as shown. <br />
The URL can be used to link to this page
Your browser does not support the video tag.