Orange County NC Website
____.ii ! THE JOHN R. MCADAMS COMPANY, INC. <br /> CONSULTING r'NGINEERS . • <br /> 200 HAYES BUILDING.GLEN LENNOX CENTER <br /> 08,E <br /> P.O.BOX 2896,CHAPEL HILL,NORTH CAROLINA 27515 <br /> (919)967-7079 <br /> f:rnuaY 2, 1985 Rowse� <br /> y, <br /> Grange County Board of Commissioners z <br /> 106 E. Margaret Lane <br /> Hitlsberough, North Carolina 27278 <br /> 1 <br /> Re: Scotswood Planned Development <br /> GUM 8501A <br /> Dear Board Members: - <br /> In response to the questions and concerns raised at the November <br /> 26 public hearing on the Scotswood Planned Development, we would <br /> :like to provide additional information and clarification for the <br /> upcoming continuation of that public hearing. The following items <br /> are addressed or have been revised on the plans: <br /> Specification of existing vegetation types. -The entire tract is <br /> . densely wooded with both deciduous and coniferous type trees <br /> and underbrush. Although a detailed tree study has not been <br /> done, all considerations to preserve specimen trees will be <br /> taker. during construction. Also, supplemental plantings <br /> will be provided to meet all screening requirements and any <br /> Other conditions affected by the Special Use Permit. <br /> Impervious surface ratios. -These ratios were in fact provided <br /> in the plan package on the "Preliminary Storm Drainage/Erosion <br /> Control Plan". We have included our specific calculations in <br /> . <br /> this package to further clarify. <br /> objection to lots not facing St. Mary's Road and Carolina Avenue. <br /> -The lot layout of the project was designed to have the least <br /> negative impact on the adjacent properties. The classification <br /> and further improvements proposed for St. Mary's Road are not <br /> conducive to its use for a multitude of driveway turnouts and <br /> we resisted using Carolina Avenue frontage to avoid a traffic . <br /> { - impact on the existing Eastwood properties. The developers <br /> propose to work with these dissenting land owners and provide <br /> a solution using a combination of bufferyard and extensive <br /> 1' supplemental planting. <br /> t <br /> i <br /> I <br /> i <br /> i <br /> i <br /> a <br /> 1 <br /> w..- -. <br />