Browse
Search
Agenda - 02-18-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 02-18-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 11:26:00 AM
Creation date
9/20/2016 10:34:09 AM
Metadata
Fields
Template:
BOCC
Date
2/18/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2-3 <br /> WORK_ PL!"'11 PROJECT: INTERSTATE 40 CORRIDOR STUDY <br /> -- ----- - OBJECTIVE NO_-_-_? RUARY13 --- ----OBJECTIVE. TO DEVELOP A PLAN AND STANDARDS FOR IMPLEMENTION ADDRESSING LAND DEVELOPMENT ADJACENT TO THE INTERSTATE 40 CORRIDOR <br /> TASK ACTIVITY STAFF J F M A M J J A . S O N D <br /> Identify land use preferences of Map potential residential, commercial Planner III- Q <br /> neighborhood residents and property and industrial locations preferred by Comprehensive <br /> owners.(Continued). residents/owners. <br /> Prepare design standards for Compile current NCDOT access standards Planner I - Q <br /> interchange/corrdior development. for Interstate (controlled access) Current <br /> highways. <br /> Compile current Orange County standards Planner I - Q <br /> for Interstate corridor and site Current <br /> development. <br /> Survey/inventory of interchange/corridor Planner I <br /> site design and access standards for Current <br /> State and Southeast region. Q <br /> Identify desired standards and apply to Planner III- <br /> example sites. Current <br /> Review and comment by Ordinance Review Planner III- <br /> Subcommittee. Current <br /> Make revisions as necessary. Planner III- <br /> Prepare alternative plans for Prepare composite map showing locations Current A <br /> development of E-40 corrdior. most suited for residential, Planner III- L] <br /> commercial and industrial development. Comprehensive <br /> Prepare plan alternatives which: Planner III- <br /> - Reflect existing Land Use Plan. Comprehensive <br /> - Reflect development locational <br /> preferences. <br /> - Reflect neighborhood locational <br /> preferences. <br /> - Reflect balanced development/neigh- ; <br /> boyhood preferences. <br /> Conduct public information meeting to Notify residents/owners, Township Planner I- <br /> obtain comment on plan alternatives. Advisory Councils and Orange County/ Current <br /> Chapel Hill/Carrboro Planning Boards <br /> of meeting. <br /> ACTIVITY SYMBOLS: A ACTIVITIES TO BE COMPLETED AT A SPECIFIC FUTURE DATE. A ACTIVITY'COMPLETED, At— A ACTIVITY COMPLETED AHEAD Of SCHEDULE. <br /> ❑ -),A ACTIVITY DELAYED TO NEW COMPLETION DATE- <br />
The URL can be used to link to this page
Your browser does not support the video tag.