Orange County NC Website
.ice <br /> 6. p. 15 Section 8.1(1) the velocity requirement in this <br /> paragraph could be strengthened by making it contingent upon <br /> adequate design calculation procedures. <br /> 7. p. 17 Section 9(b)(3) change the maximum permissible velocities <br /> in F.P.S. in the table as shown to 5.0 and 5.5 respectively. <br /> 8. p. 19 Section 13 this paragraph omits several key items <br /> including installation of such measures as required by <br /> the Ordinance, or the Act as well as an approved plan, the <br /> requirement for installing as well as maintaining permanent <br /> measures, and the responsibilities of persons in possession <br /> or control of the land as well as the landowner. See <br /> Section 13 of the Model Ordinance. <br /> 9. p. 19 Section 15(a) in the third line a reference is made to <br /> Section 5.1. Where is Section 5.1? <br /> p. 20 Section 15(b) in the second line reference is made to a <br /> "written notice to comply". This is in conflict with the <br /> intent of the Model. This must be changed to state a <br /> "written notice of violation". <br /> 10. p. 20 Section 17(a) this paragraph states the requirement of <br /> approvals and permit issuance for sites 20,000 square feet <br /> and larger. This is fine; however, you may wish to consider <br /> those instances in which erosion control plans may be <br /> required for areas smaller than 20,000 square feet as <br /> provided in Section 6.1. <br /> p. 21 Section 17(a)(3) same note as above. <br /> p. 22 Section 17(f) change "engaged in" and "responsible for" to <br /> "conducting" as shown. <br /> 11. p. 22 Section 18(a) change "is" in the fifth line to "are". <br /> 12. p. 25 Section 20 change "of a plan" in the fourth line to "of <br /> an approved plan". <br /> 13. p. 26 Section 21(c) change "sites of land-disturbing activities" <br /> ito "sites of any land-disturbing activities" in the sixth <br /> line. <br /> p. 27 ,Section 21(f) change "responsible for" and "owner or <br /> contractor" to "conducting" and "person conducting the <br /> land-disturbing activity" respectively as shown. <br /> I <br /> I <br />