•
<br /> PROPOSED PROJECTS.TO .
<br /> .,INCREASE WATER SUPPLY 0 E
<br /> •
<br /> SOURCE OF FUNDS
<br /> • State Grant (Senate Required Agency Responsible
<br /> Bi11. 2J Orange . Matching for Matching Funds To
<br /> Unincorporated - - :Funds
<br /> -.986--87 ,PROJECTS
<br /> • ..1. Orange County Water Level 4,000 Orange Co.
<br /> Fla5hbaard 4,000 Orange Alamance
<br /> a. Lake Orange 16,000 16,000 4,000 Hillsborough :. •000
<br /> b. Professional Services •-• 1,000 1,000 Orange County I 1 ,000
<br /> c. Other 2..000 .2,000 ... " I 1,000
<br /> d. Engineering Studies 19,425 19,425 ' - ,e50
<br /> Sub-total x$38,425 - 38,425 $7 ,850
<br /> -2. - Orage-Alamance Water Corp. :
<br /> a. 6" meter - 1,250 1,250 Orange Alamance
<br /> - b. 12" meter _ : 5,000 5,000
<br /> c. Gravity by-pass : 7,500 7,500 IV "
<br /> d. Professional Services . : 2,500 2,500 1, "
<br /> Sub-total .. : $16,250 16,250 $30,500
<br /> •
<br /> 13. Hillsborough :
<br /> a. Silt Removal --- ___
<br /> b. Pump and Controls Change • 18,500 18,500 Hillsborough 37,500
<br /> c. Water level, Lake Ben 35,000 35,000 ti 70,000
<br /> Johnson
<br /> d. Professional Services _ 4,000 . 4,000 " 8,000
<br /> Sub-total $57,500 57,500
<br /> $115,000
<br /> 4. Orange Water and Sewer -
<br />•
<br /> Authority.
<br /> a. Professional Services 8;750 8,570 Orange Water and 17',500
<br /> Design and Specifications, Sewer Authority
<br /> Booster Pump Station
<br /> ' Sub-total $8,750 8,570 $17,500
<br /> TOTAL $121;225 121,225 $24,450
<br /> 1987-88 PROJECTS •
<br /> 1. Orange County
<br /> Engineering Studies 33,725 33,725
<br /> 2. Orange Water and Sewer
<br /> Authority •
<br /> Booster Pump Construction 87,500 87,500 175,000
<br /> TOTAL $121,225 121,225 $242,450
<br />
|