Orange County NC Website
• <br /> PROPOSED PROJECTS.TO . <br /> .,INCREASE WATER SUPPLY 0 E <br /> • <br /> SOURCE OF FUNDS <br /> • State Grant (Senate Required Agency Responsible <br /> Bi11. 2J Orange . Matching for Matching Funds To <br /> Unincorporated - - :Funds <br /> -.986--87 ,PROJECTS <br /> • ..1. Orange County Water Level 4,000 Orange Co. <br /> Fla5hbaard 4,000 Orange Alamance <br /> a. Lake Orange 16,000 16,000 4,000 Hillsborough :. •000 <br /> b. Professional Services •-• 1,000 1,000 Orange County I 1 ,000 <br /> c. Other 2..000 .2,000 ... " I 1,000 <br /> d. Engineering Studies 19,425 19,425 ' - ,e50 <br /> Sub-total x$38,425 - 38,425 $7 ,850 <br /> -2. - Orage-Alamance Water Corp. : <br /> a. 6" meter - 1,250 1,250 Orange Alamance <br /> - b. 12" meter _ : 5,000 5,000 <br /> c. Gravity by-pass : 7,500 7,500 IV " <br /> d. Professional Services . : 2,500 2,500 1, " <br /> Sub-total .. : $16,250 16,250 $30,500 <br /> • <br /> 13. Hillsborough : <br /> a. Silt Removal --- ___ <br /> b. Pump and Controls Change • 18,500 18,500 Hillsborough 37,500 <br /> c. Water level, Lake Ben 35,000 35,000 ti 70,000 <br /> Johnson <br /> d. Professional Services _ 4,000 . 4,000 " 8,000 <br /> Sub-total $57,500 57,500 <br /> $115,000 <br /> 4. Orange Water and Sewer - <br />• <br /> Authority. <br /> a. Professional Services 8;750 8,570 Orange Water and 17',500 <br /> Design and Specifications, Sewer Authority <br /> Booster Pump Station <br /> ' Sub-total $8,750 8,570 $17,500 <br /> TOTAL $121;225 121,225 $24,450 <br /> 1987-88 PROJECTS • <br /> 1. Orange County <br /> Engineering Studies 33,725 33,725 <br /> 2. Orange Water and Sewer <br /> Authority • <br /> Booster Pump Construction 87,500 87,500 175,000 <br /> TOTAL $121,225 121,225 $242,450 <br />