Browse
Search
Agenda - 01-21-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 01-21-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 9:45:18 AM
Creation date
9/20/2016 8:46:51 AM
Metadata
Fields
Template:
BOCC
Date
1/21/1986
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORAL COUNTY 021 <br /> BOARD OF COMMISSIONERS Action Agenda <br /> ACTION AGENDA ITEM ABSTRACT Item No. F6 <br /> Meeting Date: JANUARY 21, 1986 <br /> SUBJECT: WASTEWATER COLLECTION AND PURCHASE CONTRACT AMENDMENT <br /> DEPARTMENT: COUNTY MANAGER PUBLIC HEARING: des X No <br /> ATTACHMENT(S) : INFORMATION CONTACT: MANAGER'S <br /> OFFICE. X501 <br /> TEL NUMBER: <br /> YES Hillsborough - 732-8181 <br /> Chapel Hill - 968-4501 <br /> Mebane - 227-2031 <br /> Durham - 688-7331 <br /> PURPOSE: To add two items to the wastewater collection and purchase <br /> contract with the Town of Hillsborough. <br /> NEED: Farmers Home Administration in completing the final review <br /> concluded that the contract is acceptable. subject to adding two <br /> items: <br /> 1. Contract needs minimum term of forty years to coincide with <br /> the duration of the farmers home loan. <br /> 2. Designate who is to be responsible for maintenance of the <br /> master meter. <br /> IMPACT: The contract will need amending as follows: <br /> Number 6. would be changed to read: <br /> The County shall install and maintain a meter as shall be set <br /> forth in the plans and specifications of project at the point <br /> where the County's force main changes to a gravity line at <br /> Orange Heights Road. The meter will measure the flow of <br /> wastewater from the County's system into the Town's system. <br /> Number 12. (new paragraph) <br /> The Town of Hillsborough is willing to make its wastewater <br /> collection system and wastewater treatment facility available to <br /> treat wastewater generated by County's wastewater collection <br /> system for a period of 40 years. <br /> RECOMMENDATION(S): <br /> Approve the two changes and transmit to Hillsborough for its <br /> approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.