Orange County NC Website
ATTACHMENT it <br /> COMMENTS CONCERNING NDRAFTTLANDNUSEEPLANAFROJOTY <br /> FOR JOINT PLANNING AREA <br /> I AM EVERETT BILLINGSLEY. EXECUTIVE DIRECTOR OF ORANGE WATER AND <br /> SEWER AUTHORITY (OWASA) . I WILL MAKE A FEW GENERAL REMARKS <br /> CONCERNING THE DRAFT LAND USE PLAN FOR THE JOINT PLANNING AREA, AND <br /> THE IMPLICATIONS FOR WATER AND SEWER UTILITY PLANNING AND <br /> MANAGEMENT. FURTHER COMMENTS MAY BE PROVIDED TO YOU FOLLOWING MORE <br /> DETAILED REVIEW OF THE INFORMATION PRESENTED HERE TONIGHT. <br /> As PROPOSED IN THE DRAFT PLAN, THE INCLUSION OF THE UNDEVELOPED AREA <br /> WITHIN THE BOLIN CREEK. BOOKER CREEK AND LOWER MORGAN CREEK DRAINAGE <br /> BASINS IN THE URBAN TRANSITION AREA IS VERY APPROPRIATE. AS THESE <br /> AREAS CAN BE SERVED THROUGH GRAVITY SEWER EXTENSIONS FROM THE <br /> EXISTING SEWER SYSTEM. THESE AREAS CAN ALSO BE SERVED FROM <br /> EXTENSIONS TO THE EXISTING WATER SYSTEM. FURTHER ANALYSIS IS NEEDED <br /> OF THE POTENTIAL NUMBER OF RESIDENTS THAT WOULD BE IN THESE AREAS <br /> GIVEN THE ASSUMED OVERALL DEVELOPMENT DENSITY; HOWEVER, IT APPEARS <br /> THAT EXISTING AND PROPOSED WATER AND SEWER FACILITIES WOULD BE <br /> ADEQUATE TO SUPPORT THE PROJECTED POPULATION INCREASE . <br /> OWASA STAFF HAS ALSO DETERMINED THAT PUBLIC WATER AND SEWER SERVICES <br /> CAN BE EXTENDED TO THE I-40/NC86 INTERCHANGE AREA, WHICH THE DRAFT <br /> PLAN SHOWS AS BEING INCLUDED IN THE TRANSITION AREA. EXTENSIONS TO <br /> THZS AREA WOULD BE UNDERTAKEN IN ACCORDANCE WITH OWASA'S WATER AND <br /> SEWER EXTENSION POLICIES. THIS INTERCHANGE AREA IS LOCATED IN THE <br /> NEW HOPE CREEK DRAINAGE BASIN; THEREFORE . SEWER SERVICE WOULD HAVE <br /> TO BE PROVIDED BY UTILIZING ONE OR MORE PUMP STATIONS AND FORCE <br /> MAINS. THE URBAN TRANSITION AREA NORTHWEST OF THE I-40/US 15-501 <br /> INTERCHANGE NEAR THE DURHAM COUNTY LINE IS ALSO LOCATED IN THE NEW <br /> HOPE CREEK DRAINAGE BASIN. THIS AREA CAN ALSO BE PROVIDED WITH <br /> PUBLIC WATER AND SEWER SERVICES. A WASTEWATER PUMP STATION WOULD BE <br /> NEEDED HERE , TOO. <br /> THE URBAN TRANSITION AREA SHOWN IN THE DRAFT LAND USE PLAN DOES NOT <br /> APPEAR TO INCLUDE ANY ADDITIONAL AREAS WITHIN THE NEW HOPE CREEK <br /> BASIN. IF ORANGE COUNTY AND THE TOWNS DETERMINE THAT DEVELOPMENT AT <br /> SUBURBAN OR URBAN DENSITIES IS APPROPRIATE IN THIS AREA, OWASA WATER <br /> AND SEWER FACILITIES COULD BE EXTENDED TO THE AREA, INCLUDING THE <br /> NEW HOPE CHURCH ROAD/I-40 INTERCHANGE AREA . THESE FACILITIES COULD <br /> BE EXTENDED BY DEVELOPERS, IN ACCORDANCE WITH OWASA' s WATER AND <br /> SEWER EXTENSION POLICIES, OR BY ONE OR MORE GOVERNMENTAL UNITS. <br /> IN THOSE AREAS WHERE PUBLIC WATER AND SEWER SERVICES ARE NOT <br /> PROVIDED. DEVELOPMENT WILL OCCUR USING ON-SITE WATER SUPPLY AND <br /> WASTEWATER DISPOSAL SYSTEMS OR SMALL-SCALE COMMUNITY WATER SYSTEMS <br /> AND PACKAGE WASTEWATER TREATMENT PLANTS. BASED ON THE INCREASE IN <br /> PACKAGE PLANT PERMIT APPLICATIONS AND CONSTRUCTION ACTIVITIES IN THE <br /> REGION, THE ECONOMIC FEASIBILITY OF UTILIZING THESE FACILITIES <br /> APPEARS ACCEPTABLE FOR DEVELOPERS. THERE ARE AN INCREASING NUMBER <br /> OF DEVELOPMENTS IN OUTLYING AREAS WHICH ARE UTILIZING PACKAGE-TYPE <br /> 1 <br />