Orange County NC Website
Soil & Material Engineers, Inc. <br /> Fee Schedule 094 <br /> Effective March 1, 1985 <br /> 3. Hourly Rates for Drill Rig & Crew <br /> a. 'Truck Mounted (Auger or Rotary), per hour <br /> b. All Terrain Mounted (Auer or Rotar ) 10.00 <br /> g y Rotary), hour $ 110.00 <br /> 4. Dutch Cone Penetrometer Borings, per linear meter <br /> $ 18.00 <br /> 5. Auger Borings, per linear foot <br /> $ 5.50. <br /> 6. Wash Borings (4"diameter), per linear foot <br /> - For borings larger than 4"diameter, add $1.00 per inch $ 5.50 <br /> of additional diameter. <br /> 7. Subsistence per Drill Crew, per day <br /> 8. Undisturbed Samples: 90.00 <br /> a. Standard 3" Shelby Tube Samples, each <br /> b. Piston 3" Shelby Tube Samples, each $ 80.00 <br /> $ 95.00 <br /> c. Pitcher Samples, each <br /> 9. Bag Samples, each $ 190.00 <br /> 10. Difficult Moving (in Excess of I hour per Boring), $ 35.00 <br /> Clearing Access, Standby Time, Laying Water Line, <br /> Hauling Water or Drilling and Testing on Time Basis, ' <br /> and Survey Layout of Borings, per hour <br /> $ 90.00 <br /> 11. Grouting <br /> of Boreholes and Piezometers, per hour <br /> 12. Rock Coring: $ 100.00 <br /> a. Set Up; per hole <br /> b. Installation Casing, per foot $ 90.00 <br /> $ 3.00 <br />