Orange County NC Website
085 <br /> Hazan& Sawyer, P.C. <br /> November 22, 1985 • <br /> Page 2 <br /> estimate that the maximum cost of this investigation will be approximately $14,945.00. <br /> This total cost includes a contingency to perform additional test borings or seismic work <br /> based on the results of the test data as it becomes available during the investigation. The <br /> anticipated engineering time for this project includes layout of the borings'in the field and <br /> coordination of the utility companies to locate underground utilities, as well as analysis of <br /> the subsurface soil data and preparation of the written report. Table 2 presents our. <br /> estimated maximum cost and you will be billed only for the actual quantities of work <br /> performed for this investigation. <br /> We'are prepared to initiate work on this project within 1 week of receipt of <br /> authorization to proceed and can complete all work, including issuance of the report, <br /> within approximately 4 weeks of authorization. If this proposal meets with your <br /> acceptance, please execute and return one copy of the attached Proposal Acceptance <br /> sheet to provided us with authorization to proceed and proper billing instructions. <br /> We,appreciate the opportunity to present this proposal to provide professional <br /> services on this project. Please contact us if you have any questions concerning this <br /> proposal or if we may be of further assistance. <br /> • <br /> Very truly yours, <br /> SOIL & MATERIAL ENGINEERS, INC. <br /> f4LIA-eatl, 7-3,dea;‘ <br /> Leland W. Parker, E.I.T. <br /> Edward B. Hearn, RE. <br /> LWP/EBH:kat <br /> Attachments <br /> SOIL&MATERIAL ENGINEERS,INC. <br />