Browse
Search
Agenda - 01-06-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 01-06-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 9:33:56 AM
Creation date
9/19/2016 3:27:52 PM
Metadata
Fields
Template:
BOCC
Date
1/6/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.;,.. 084 <br /> `;;..' SOIL& MATERIAL ENGINEERS INC. ENGINEERING-TESTING-INSPEC-ION <br /> .10 V v 3109 Spring Forest Road, Box 58069, Raleigh, NC 27658-8069, Phone (919) 872-2660 <br /> S 1 481-85 <br /> November 22, 1985 <br /> Hazen & Sawyer, P.C. <br /> 4300 Glenwood Avenue <br /> P. O. Box 30428 <br /> Raleigh, North Carolina 27622 <br /> Attention: Mr. Donald L. Cordell, P.E. <br /> Reference: Proposal for Subsurface Investigation <br /> Efland-Cheeks Township Sanitary Sewer Facilities <br /> Orange County, Hillsborough, North Carolina <br /> Gentlemen: <br /> Soil & Material Engineers, Inc. is pleased to present this proposal for <br /> performing a subsurface investigation for the proposed Efland-Creeks sanitary sewer <br /> facilities in Orange County and Hillsborough, North Carolina. It is our understanding that <br /> this project will involve the construction of approximately 18,900 feet of 8-inch force <br /> main water line, approximately 29,000 feet of 8 to 12-inch gravity sewer line, 1 pump <br /> station, and 4I bored and jacked road crossing locations. The new gravity line will be <br /> located in and around the township of Efland, North Carolina. The new force main will <br /> begin at the proposed site of the McGowan Creek pump station on Efland-Grove Road and <br /> will extend southward to U.S. 70 and then will parallel U.S. 70 to the east for <br /> approximately!17,600 feet. The 4 proposed bore and jack locations are all located along <br /> U.S. Highway 70. Based upon a site reconnaissance of the line locations, it appears that <br /> portions of the gravity line are located in woods that are presently inaccessible to drill <br /> equipment. <br /> We propose to utilize standard penetration test boring and seismic refraction <br /> techniques (inl, the woods) to evaluate subsurface conditions along the length of the <br /> proposed lines, the proposed pump station and bore and jack locations to provide <br /> contractors with sufficient information to bid on the project based on unclassified <br /> excavation. As a minimum, we propose to obtain an indication of rock depth at <br /> approximately I 600 foot intervals along the entire combined length of approximately <br /> 48,000 feet of the proposed lines. These locations have been preliminarily selected based <br /> on a cursory site reconnaissance to concentrate borings and seismic profiles in those areas <br /> which appear to most likely have difficult excavation or difficult excavation potential. <br /> For estimating, cost, we have reviewed the available site and profile plans and proposed <br /> preliminary boring depths at each proposed boring location. The attached Table 1 <br /> presents our proposed boring locations and depths. <br /> We propose to provide these services on a unit price basis in accordance with <br /> the attached Schedule of Fees. Based on the quantities of work outlined in Table 2, we <br /> RALEIGHi, GREENSBORO, ASHEVILLE, WILMINGTON, FAYETTEVILLE, (HARLOT"E NC <br /> CL 'f <br /> SPARTAt�:Bl1RCa, (._ 1.1, CH/11"'.L- ■TON, r.411RTLE L'•EACli, GC <br /> ATLANTA,ALBANY, GA--T ,! GiTiE:3. T,;-•-C! lGIP:iNATI,OH--ORLANDO,TP:MPA, FL <br />
The URL can be used to link to this page
Your browser does not support the video tag.