Orange County NC Website
CHANGE <br /> ORDER Distribution to: <br /> OWNER El <br /> AlA DOCUMENT C707 ARCHITECT <br /> CONTRACTOR <br /> 068 FIELD 0 <br /> OTHER ® FILE <br /> PROJECT: RENOVar I oNS: CHANGE ORDER NUMBER: G.04 <br /> (name, address) ORANGE couNTY H I STOR I C <br /> COUR 1-1ous1; INITIATION DATE: <br /> TO (Contractor): HILLSBOROUGH NC JAN. 6, 1986, <br /> DUR}lA11 CONSTRUCTION CO INC ARCHITECT'S PROJECT NO: ' oc,s f <br /> 1 1 z i3RITTANiA AVE CONTRACT FOR: GENERAL <br /> P.O.BOX 15028 <br /> DURHAM NC 27704 0 0 2 8 GONS.TRUt~T I ON <br /> CONTRACT P/O ID NO . 7741 CONTRACT DATE: MARCH. 20, 1985 <br /> I <br /> You are directed to make the following changes in this Contract: <br /> EXTEND THE CONTRACT TIME BY FIFTY-NINE (59) CONSECUTIVE CALENDAR DAYS, <br /> ESTABLISHING THE DATE OF SUBSTANTIAL COMPLETION ON MARCH 10, 1986, <br /> AS AUTHORIZED BY THE OWNER. <br /> I <br /> - I <br /> Not valid until signed by both the Owner and Architect. 7-- <br /> .Signature of the Contractor indicate,. his agreement herewith, including any adjustment in the Contract Sum or Contract Time. <br /> The original (Contract Sum) (Guaranteed Maximum Cost) was '- <br /> 00 <br /> Net change by previously authorized Change Orders $ 247 700.34 <br /> The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was $ 1 a 269,a4 <br /> The (Contract Sum) (Guarantied Maximum Cost) will be t� $ xst zs9,s4 <br /> by this Change Order L ( }(unchanged) <br /> a $ <br /> o <br /> The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be . . . $ 261 269.34 <br /> The Contract Time will be (increased) (decreased) (unchanged) by <br /> The Date of Substantial Completion as of the date of this Change Order•therefore is ( 59 ) Days. <br /> MARCH i o., 1 s 8 s <br /> ROMAN KOLOD I.i JAMES WEBS Authorized: <br /> DURHAM CONSTRUCTION CO INC <br /> ARCHITECT COU'NT'Y OF ORANGt <br /> ARCHITECTS CONTRACTOR OWNER NORTH CAROLINA <br /> Address 2 p 1 E ROSEMARY ST Address P.O BOX i 5 0 2 II Address <br /> C PEA. DURHAM NC 2 7 7 0 4 0 0?_8 I 0 6 E MARGARET LANE <br /> LL HILL NC 27$14 <br /> H I LLSTIQ3TQ[T�,}I NC <br /> BY fr w�,K- <br /> BY <br /> BY <br /> DATE "14a ,3 Irec ( DATE <br /> DATE <br /> AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • AIAF- • p <br /> THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW OR AVE., NW,WASHINGTON, D.C.200(11. <br /> G701 —197$ <br />