Browse
Search
Agenda - 01-06-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 01-06-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 9:33:56 AM
Creation date
9/19/2016 3:27:52 PM
Metadata
Fields
Template:
BOCC
Date
1/6/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE <br /> Distribution to: <br /> ORDER OWNER <br /> • AJA DOCUMENT C701 ARCHITECT <br /> CONTRACTOR ® <br /> 06,7 <br /> FIELD ❑ • - <br /> OTHER ® FILE <br /> PROJECT: RENOVATIONS; CHANGE ORDER NUMBER: E..02 <br /> (name, address) ORANGE COUNTY HISTORIC <br /> COURTHOUSE INITIATION DATE: JAN. s. 1986 :I'. <br /> TO (Contractor): HILLSBOROUGH NC <br /> ADAMS AND TILLEY ELECTRIC co INC ARCHITECT'S PROJECT NO: OC.8t <br /> 1008 CALVIN STREET CONTRACT FOR: ELECTRICAL <br /> P.O. sox 12417 <br /> RESEARCH TRIANGLE PARK NC 27709 CONSTRUCTION' <br /> CONTRACT P.O. ID NO. 7739 CONTRACT DATE: MARCH 20, 1965 <br /> - • You are directed to make the following changes in this Contract: <br /> EXTEND THE CONTRACT TIME BY FIFTY-NINE (59) CONSECUTIVE CALENDAR DAYS, <br /> ESTABLISHING THE DATE OF SUBSTANTIAL COMPLETION ON MARCH 10, 1986, <br /> AS AUTHORIZED BY THE OWNER. <br /> Not valid until signed by both thelO%iner and Architect. <br /> Signature of the Contractor indicate, his agreement herewith, including any adjustment in the Contract Sum or Contract Time <br /> The original (Contract Sum) (sytta t) was $ 34 240.00 <br /> Net change by previously authIrized Change Orders $ <br /> The (Contract Sum) ( -ost) prior to this Change Order was 00 <br /> $ 34 240.00 <br /> The (Contract Sum) (6 ).st) will be (increased) (decreased) (unchanged) 0o <br /> by this Change Order $ <br /> The new (Contract Sum) ( )including this Change Order will be .. . $ 34 240.00 <br /> The Contract Time will be .(increased) (del_ceared) ( n€h i. ) by <br /> ( 59 1 Days. <br /> The Date of Substantial Completion as of the date of this Change Order therefore is <br /> MARCH 10, 1986 • <br /> Authorized: <br /> ROMAN ICOLOD 1 J JAMES WEB$ ADAMS/T I LLEY ELECTR I C CO I NC. COUNTY OF ORANGE <br /> ARCHITECT ARCH P <br /> ITECTS CONTRACTOR OWNER NORTH P.O. BOX I 2417 NORTH CAROL I NA <br /> Address <br /> 201 E ROSEMARY ST Address Address { <br /> 1 0 6 E MARGARET LANE <br /> HAPEL HILL NC 27514 RES. TRIANGLE PARK NC <br /> 27709 HILLSBOROUGH NC <br /> BY , �'� r BY <br /> BY <br /> DATE ✓xf'C) 3 49‘ DATE DATE <br /> AIA DOCUMENT C701 • CHANGE ORDER • AI'RIL 1978 EDITION • AIA • a 1978 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W-, WASHINGTON, D.C. 2000. 0701 —7978 <br />
The URL can be used to link to this page
Your browser does not support the video tag.