Browse
Search
Agenda - 01-06-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 01-06-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 9:33:56 AM
Creation date
9/19/2016 3:27:52 PM
Metadata
Fields
Template:
BOCC
Date
1/6/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE Distribution to: <br /> ORDER OWNER ECT <br /> A/A DOCUMENT C701 CONTRACTOR <br /> FIELD ❑ <br /> OTHER ® FILE <br /> PROJECT: RENOVATI,ONS: CHANGE ORDER NUMBER: HAC.02 <br /> (name, address) ORANGE COUNTY HISTORIC <br /> COURTHOUSE INITIATION DATE: JAN. 6 1986 <br /> TO (Contractor): HILLS9DROUGH Nc <br /> COMFORT (ENGINEERS INC ARCHITECT'S PROJECT NO: oc.8f <br /> P.O. BOX 2995 CONTRACT FOR: HEATING/ <br /> DURHAM NC 27705 0995 <br /> AIR CONDITIONING <br /> CONTRACT P.O. ID NO. 7756 CONTRACT DATE: MARCH 20, 1985 <br /> - You are directed to make the)following changes in this Contract: <br /> EXTEND THE CONTRACT TIME BY FIFTY-NINE ( 59) CONSECUTIVE CALENDAR DAYS, <br /> ESTABLIDHING THE DATE OF SUBSTANTIAL COMPLETION ON MARCH 10, 1986, <br /> AS AUTHORIZED BY THE OWNER, <br /> Not valid until signed by both the Owner and Architect. <br /> Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time- <br /> The original (Contract Sum) ( ) was $ 8o 629.00 . <br /> Net change by previously authi�lized Change Orders - ; oo <br /> The (Contract Sum) ( M tximur Cost) prior to this Change Order was $ 80 629.00 , <br /> The (Contract Sum) ( Cost) will be (increased) (decreased) (unchanged) <br /> by this Change Order S 00 <br /> The new(Contract Sum) ( ) including this Change Order will be $ 80 629.00 . <br /> The Contract Time will be (increased) (d0c-cea4:e4 (or4c-Laufied) by ( 59 ) Days. <br /> The Date of Substantial Completion as of the date of this Change Order therefore is MARCH 10, 1986 . <br /> Authorized: <br /> ROMAN KOLODIJ (JAMES WEBB COMFORT ENGINEERS INC. COUNTY OF ORANGE <br /> ARCHITECT ARCHITECTS CONTRACTOR OWNER <br /> P.O. BOX 2995 NORTH CAROLINA <br /> Address Address <br /> 2 0 f E ROSEMARY ST Address to 6 E MARGARET LANE <br /> EL HIJ..L NC' 27514 DURHAM NC 27705 0995 <br /> ` p H I LLS�OFtOUGH NC <br /> Air- 1:2tniAls10. _ <br /> BY . -4' r ., �.% =s►1�, BY 14--. e. dx:(464-1--- BY <br /> DATE .J 3 (7cS DATE 2A...A.) /7� i4'$(Q DATE 2 -/f .24 <br /> AIA DOCUMENT C701 • CHANGE ORDER • APRIL 1978 EDITION • AJAR • O 1978 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS.1735 NEW YORK AVE..N.W.,WASHINGTON.D.C.2001w. G701—1978 <br /> . - - -- .- - <br />
The URL can be used to link to this page
Your browser does not support the video tag.