Browse
Search
Agenda - 01-06-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 01-06-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 9:33:56 AM
Creation date
9/19/2016 3:27:52 PM
Metadata
Fields
Template:
BOCC
Date
1/6/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE <br /> Distribution to: <br /> ORDER OWNER <br /> AM DOCUMENT G701 <br /> ARCHITECT LE <br /> CONTRACTOR MI <br /> FIELD 0 <br /> OTHER ® FILE <br /> PROJECT: RENOVATIONS: CHANGE ORDER NUMBER: G.04 <br /> (name, address) ORANGE COUNTY HISTORIC <br /> COURTHO4JSE INITIATION DATE: JAN. 6, 1986 <br /> TO (Contractor): HILLSBOROUGH NC <br /> DURHAM CONSTRUCTION CO INC ARCHITECT'S PROJECT NO: OC.8t <br /> t 12 ERITTANIA AVE CONTRACT FOR: GENERAL <br /> P.O.EOX 15028 CONSTRUCTION <br /> DURHAM INC 27704 0028 <br /> CONTRACT PLO ID NO. 7741 CONTRACT DATE: INCH 20, 1985 <br /> You are directed to make the following changes in this Contract: <br /> EXTEND THE CONTRACT TIME BY FIFTY-NINE (59) CONSECUTIVE CALENDAR DAYS, <br /> ESTABLISHING THE DATE OF SUBSTANTIAL COMPLETION ON MARCH 10, 1986, <br /> AS AUTHORIZED BY THE OWNER. <br /> • <br /> Not valid until signed by both the Owner and Architect. <br /> Signature of the Contractor indicate., his agreement herewith, including any adjustment in the Contract Sum or Contract Time <br /> The original (Contract Sum) (Gi aranteed Maximum Cost) was $ 247 700.00 <br /> Net change by previously authorized Change Orders $ 1 s 569.34 . <br /> The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was $ 261 269.34 . <br /> The (Contract Sum) (Guaranteed Maximum Cost) will be (iamaciset1) (decaoa -(wrchartged) <br /> by this Change Order $ 0 <br /> The new(Contract Sum) (Guaranteed Maximum Cost)including this Change Order will be $ 261 269.94 <br /> The Contract Time will be (increased) (decreased) (unchanged) by ( 59 ) Days. <br /> The Date of Substantial Completion as of the date of this Change Order therefore is MARCH 10, 1986 <br /> Authorized: <br /> HAM CONSTRUCTION CO INC <br /> ROMAN KOLODIJ ' JAMES WEBB DUR COUNTY OF ORANGE <br /> ARCHITECT ARCHITECTS CONTRACTOR OWNER NORTH CAROLINA <br /> Address Address - <br /> 201 E ROSEMARY 5T P.O Ro. BOX 15028 Address 106 E MARGARET LANE <br /> CHAPEL HILL NC 27514 DURHAM NC 27704 0028 HILLSBOR• GH NC <br /> 8Y fii <br /> /ZPA(7041? BY L�///L�'� !�%� V <br /> / BY ��•- <br /> DATE 4.646 3 (`ra� (7 DATE /-•/4y ~ r-�p DATE /^ ,/-- d t, <br /> AlA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • AIM, • @ 1978 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE.,N.W.WASHINGTON,D.C.20IHN. G701--7978 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.