Browse
Search
Agenda - 01-06-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 01-06-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 9:33:56 AM
Creation date
9/19/2016 3:27:52 PM
Metadata
Fields
Template:
BOCC
Date
1/6/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY ANNIXG DEPORTMENT <br /> mLLSBC'rOCGf <br /> NORTH CAROLINA <br /> 27278 <br /> II <br /> MEMORANDUM <br /> TO: Eddie Kirk <br /> FROM : , Warren Faircloth , Erosion Control Office <br /> SUBJECT : Revisions to Scottswood Plan <br /> DATE anuary 6 , 1986 <br /> I have discussed my concerns regarding this project <br /> with Cindee Wolf of the John R . McAdams Company and <br /> reviewed the comments in her letter of January 2, <br /> 1986 to the Commissioners . <br /> In her letter, she proposes to have the flood plain <br /> and drainage easements surveyed and platted on the <br /> final plans , which seems appropriate . She also <br /> recognizes that unconventional construction phasing <br /> will be necessary to provide erosion control during <br /> construction of the multifamily and commercial tracts <br /> and that the details of the erosion control will have <br /> to be worked out during the approval process for the <br /> erosion control plans for these tracts . The changes <br /> made to the Lots on Cameron Circle and the <br /> recognition. that the street alignment may need <br /> altering slightly addresses my concerns about accom- <br /> modating erosion control devices in this area . <br /> Regarding the effects of the increased runoff due to <br /> development on properties downstream of the commer- <br /> cial and multifamily tracts , I suggest that a <br /> condition of approval be added that would require the <br /> construction of appropriate stormwater detention <br /> devices or other methods to control the rate of <br /> runoff from these areas . I also suggest that the <br /> specific requirements be left to the descretion of <br /> the Planning Director so that a thorough investiga- <br /> tion can be made of the controls needed to provide <br /> adequate protection of downstream properties . <br />
The URL can be used to link to this page
Your browser does not support the video tag.